Dubai Municipality · Change · Updated November 2026

Change of Consultant or Contractor After the Permit

The permit is issued and the project is moving, then the consultant or contractor stops. The permit can continue with a new firm.

After a Dubai Municipality building permit is issued, the owner can replace the consultant or the contractor. To change the contractor, Dubai Municipality normally needs a NOC from the old contractor. If there is a dispute and the old contractor will not give one, the owner signs the letters Dubai Municipality asks for and takes over responsibility for the works done so far, so the new contractor can continue. To change the consultant, the new consultant takes over the file, checks the works done against the permit and continues supervision. Structural Solutions takes over as consultant, prepares the change request on Build in Dubai, records the condition of the works and guides you through the letters if there is a dispute.

ContractorOld contractor NOC
If disputeOwner signs letters
ConsultantNew firm takes over

Changing contractor

What Dubai Municipality needs

SituationWhat happens
Old contractor agreesOld contractor NOC, then new contractor added to the permit
Dispute, no NOCOwner signs the needed letters to DM and takes over the changes
Works already doneRecorded by the consultant before the new contractor starts
ThenWorks continue under the same permit

Changing consultant

Taking over the file

StepGuide
Before the permitchanging consultant with DM
Documentsconsultant change documents
Site checkWe record the works done so far
ContinueSupervision to completion: villa construction supervision
Stuck approvalapproval delayed

Official sites: Dubai Municipality

What you need to know

  • Contractor change needs the old NOC.
  • Dispute? Owner signs the letters.
  • Same permit continues.
  • We take over as consultant.

Documents you will need

  • Building permit
  • Old contractor or consultant details
  • Any NOC or correspondence
  • Photos of the site

How it works

Change of Consultant or Contractor After the Permit: how it works

1. Call

Tell us what happened.

2. Review

Permit and site.

3. Letters

NOC or owner letters.

4. Submit

Build in Dubai.

5. Continue

Same permit.

Questions

Change of Consultant or Contractor After the Permit: questions

My contractor left the site. Can I change?

Yes. Ask for their NOC; if they will not give it, the owner can sign the needed letters to Dubai Municipality and take over the changes.

Do I need a new permit?

No, the change is made on the existing permit.

Will the new contractor accept the old works?

We inspect and record the works done before they start, so everyone knows the starting point.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.