Tilal Al Ghaf · Kitchen · Updated November 2026

Tilal Al Ghaf Kitchen to Living Room Opening

Opening the kitchen to the living room is the change most new owners in Tilal Al Ghaf ask about first.

Making an opening between the kitchen and living room in a Tilal Al Ghaf villa means cutting into an internal precast wall, so it needs a structural assessment, a frame or lintel design, the MAF NOC and a DDA permit. Some of these walls carry the slab above and some do not; the assessment tells you which. A partial opening with a frame is often more practical than removing the whole wall. Whether it can be done depends on whether it is structurally doable and on DDA approval. The kitchen services, such as water, drainage and any gas, also need to stay accessible. We assess, design, prepare drawings and handle approvals. Already done? We assess, design the fix and take it through approval.

WallInternal precast
OptionPartial opening
ApprovalsMAF, then DDA

Approvals

Who approves it

Same route in every sub-community.

StepWhoGuide
Community NOCMajid Al Futtaim (MAF) Community ManagementTilal Al Ghaf NOC guide
Building permitDubai Development Authority (DDA)the DDA building permit
Structural designStructural SolutionsTilal Al Ghaf structural calculations
Fire and life safetyDCD, where the works need itCivil Defence (DCD)
CompletionDDA completion certificate, then MAF final inspectionthe completion certificate

Options

Ways to open the kitchen

OptionGuide
Partial opening with a frameprecast wall opening approval
Wider openingenlarging an opening
Full wall removalTilal Al Ghaf wall removal
Kitchen openings in generalkitchen wall openings

Official sites: DDA | Dubai Civil Defence

What you need to know

  • Internal, so no outside look issue.
  • Some walls carry the slab.
  • Partial opening often easier.
  • MAF and DDA approval.

Documents you will need

  • Title deed and owner ID
  • Sub-community and villa type
  • Handover plans, if you have them (or we survey)
  • Photos of the area

How it works

Tilal Al Ghaf Kitchen to Living Room Opening: how it works

1. Photos

Kitchen and living.

2. Assess

The wall.

3. Design

Opening and frame.

4. Apply

MAF, then DDA.

5. Build

Supervised.

Questions

Tilal Al Ghaf Kitchen to Living Room Opening: questions

Can I open the kitchen in my Tilal Al Ghaf villa?

Often, depending on the wall and DDA approval after the MAF NOC.

Do I need MAF approval for an internal wall?

Yes, every structural change needs the MAF NOC. See what needs MAF approval.

Meadows owner?

See Meadows wall removal.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions handles structural assessments, design and approvals for precast villas in Tilal Al Ghaf and across Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading