Dubai South Mezzanine and Racking Approval
Warehouses in Dubai South add mezzanines for offices and storage, and high racking for stock.
A mezzanine or racking system in a Dubai South warehouse is approved by Dubai South Authority after the landlord or developer NOC, with Civil Defence (DCD) for fire and life safety. A mezzanine counts as floor area, so it is designed and approved like a new floor: steel structure, connections to the existing building, the slab under its columns, stairs and exits. High racking also needs structural calculations and affects sprinklers. We design the mezzanine or racking, check the existing slab and submit the approvals.
Route
Who approves in Dubai South
Emaar South follows its own developer route; see the guides below.
| Step | Who | Guide |
|---|---|---|
| NOC | Developer, landlord or building management | the fit-out NOC |
| Permit | Dubai South Authority | Dubai South Authority |
| Aviation | DCAA | DCAA NOC in Dubai South |
| Fire and life safety | DCD | Civil Defence approval |
Design
What a mezzanine needs
| Item | What we check |
|---|---|
| Steel mezzanine | Structure and connections |
| Slab under columns | Existing floor capacity |
| Stairs and exits | For DCD |
| Racking | Structural calculations and sprinkler impact |
| Same in DSO | DSO mezzanine and racking |
Official sites: Dubai Civil Defence
What you need to know
- Dubai South Authority approves.
- Floor area counted.
- Slab checked.
- DCD for exits.
Documents you will need
- Title deed or lease
- Developer or landlord NOC
- Existing approved drawings
- Trade licence
How it works
Dubai South Mezzanine and Racking Approval, step by step
1. Brief
Use.
2. Check
Slab.
3. Design
Mezzanine.
4. NOC
Landlord.
5. Permit
Dubai South.
6. DCD
Exits.
Questions
Dubai South Mezzanine and Racking Approval: questions
Can I add a mezzanine to my Dubai South warehouse?
Yes, with a designed mezzanine approved by Dubai South Authority and DCD.
Does a mezzanine count as floor area?
Yes, it is approved like a new floor.
Does racking need approval?
High racking needs structural calculations and affects the sprinklers.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions handles approvals in Dubai South with Dubai South Authority, DCAA and DCD. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.