Aesthetic and Dermatology Clinic Approval in Dubai
Aesthetic and dermatology clinics often open in mall units, villas and office towers, each with its own route.
An aesthetic or dermatology clinic in Dubai needs the landlord, mall or building management NOC, a fit-out permit from the authority for the area, Civil Defence (DCD) approval and the health facility licence from DHA, or from DHCA in Dubai Healthcare City. Treatment rooms need sinks and drainage, lasers and devices need power, and procedure rooms may need specialist ventilation. We handle the structure and the approvals: the layout drawings, the structural checks for new openings and drain routes, and the submissions, coordinating the specialist systems.
Approvals
Who approves a aesthetic clinic
| Step | Who | Guide |
|---|---|---|
| NOC | Landlord or building management | the fit-out NOC |
| Fit-out permit | Authority for the area (DDA in Dubai Healthcare City) | clinic fit-out approval |
| Fire and life safety | DCD | Civil Defence approval |
| Health facility licence | DHA, or DHCA in Dubai Healthcare City | DHA and clinic fit-out |
Our scope
What we do and what specialists do
We handle the structure and the approvals; specialist systems are designed by their specialists and coordinated in our drawings.
| Item | Who |
|---|---|
| Layout and approval drawings | Us |
| Openings and drain routes | Us: the structural assessment |
| Treatment room sinks and drainage | Coordinated: plumbing and drainage design |
| Procedure room ventilation | Specialist, coordinated by us |
| Villa clinic | villa into a clinic |
Official sites: Dubai Municipality | DDA | Dubai Civil Defence
What you need to know
- DHA licence.
- Mall or landlord NOC.
- DCD approval.
- Structure and approvals by us.
Documents you will need
- Tenancy contract or title deed
- Landlord or building management NOC
- Existing approved drawings, if any
- Facility type and services list
How it works
Aesthetic and Dermatology Clinic Approval in Dubai, step by step
1. Check
Unit, building.
2. NOC
Landlord.
3. Design
Layout, structure.
4. Coordinate
Specialists.
5. Permits
Authority, DCD.
6. Licence
DHA inspection.
Questions
Aesthetic and Dermatology Clinic Approval in Dubai: questions
What approvals does an aesthetic clinic need?
The landlord or mall NOC, the fit-out permit, DCD and the DHA or DHCA health facility licence.
Can an aesthetic clinic open in a mall?
If the mall allows it, through the mall NOC and the authority for the area.
Can I open one in a villa?
Villas follow the Dubai Municipality villa change of use. See villa into a clinic.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions handles the structure and approvals for healthcare facilities in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
