Healthcare · Medical centre · Updated November 2026

Medical Centre and Polyclinic Approval in Dubai

A polyclinic brings several specialties, more patients and more rooms into one unit, often across more than one floor.

A medical centre or polyclinic in Dubai needs the landlord or building management NOC, a fit-out permit from the authority for the area, Civil Defence (DCD) approval for the higher occupancy and the clinic rooms, and the health facility licence from DHA, or from DHCA in Dubai Healthcare City. Larger centres often join units, add an internal stair or carry heavy diagnostic equipment, which all need structural design. We handle the structure and the approvals: layout drawings, structural checks and strengthening, and the submissions, coordinating the specialist systems such as medical gas.

LicenceDHA or DHCA
WorksAuthority for the area
Fire safetyDCD

Approvals

Who approves a medical centre

StepWhoGuide
NOCLandlord or building managementthe fit-out NOC
Fit-out permitAuthority for the area (DDA in Dubai Healthcare City)clinic fit-out approval
Fire and life safetyDCDCivil Defence approval
Health facility licenceDHA, or DHCA in Dubai Healthcare CityDHA and clinic fit-out

Our scope

What we do and what specialists do

We handle the structure and the approvals; specialist systems are designed by their specialists and coordinated in our drawings.

ItemWho
Layout and approval drawingsUs
Joining units, new stairs, openingsUs: the structural assessment
Heavy diagnostic equipmentUs: MRI room floor load check
Medical gasSpecialist, coordinated by us
Change from officeoffice to clinic conversion

Official sites: Dubai Municipality | DDA | Dubai Civil Defence

What you need to know

  • DHA licence.
  • DCD for occupancy.
  • Joined units need structure.
  • Specialists coordinated.

Documents you will need

  • Tenancy contract or title deed
  • Landlord or building management NOC
  • Existing approved drawings, if any
  • Facility type and services list

How it works

Medical Centre and Polyclinic Approval in Dubai, step by step

1. Check

Unit, building.

2. NOC

Landlord.

3. Design

Layout, structure.

4. Coordinate

Specialists.

5. Permits

Authority, DCD.

6. Licence

DHA inspection.

Questions

Medical Centre and Polyclinic Approval in Dubai: questions

What approvals does a polyclinic need?

The landlord NOC, the fit-out permit, DCD and the DHA or DHCA health facility licence.

Can a medical centre take two floors with an internal stair?

Often, with a structural design for the slab opening and the landlord’s agreement.

Is Dubai Healthcare City different?

Yes: DDA for the works and DHCA for the licence. See Dubai Healthcare City approvals.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions handles the structure and approvals for healthcare facilities in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading