MRI Room Floor Load and Structural Check in Dubai

An MRI magnet is one of the heaviest single items brought into a building, and it has to get in through doors, corridors and lifts first.

Before an MRI or CT scanner is installed in Dubai, the floor that carries it, and every floor and lift on the route into the building, is checked. We take the equipment data from the supplier and the existing structural drawings, analyse the slab for the scanner and its supports, and check the delivery route. The result is a full structural report: either the floor can carry it as it is, or we design a spreader plate or strengthening. The report supports the fit-out approval and the landlord’s NOC. Magnetic and radiation shielding are designed by specialists and coordinated with our design.

FromExisting drawings
ResultFull report
If neededSpreader or strengthening

What we check

MRI and scanner structural checks

CheckWhat we look at
Slab capacityScanner weight and support points
Delivery routeFloors, doors and lifts on the way in
VibrationSources near the scanner room
Spreader or strengtheningDesigned if the slab needs help
Shielding weightAdded load from the specialist design

Related

Related structural guides

TopicGuide
Diagnostic centre approvaldiagnostic centre approval
Change of use assessmentthe structural assessment
Gym and heavy equipmentequipment floor load

Official sites: Dubai Municipality | DDA

What you need to know

  • Equipment data from the supplier.
  • Existing drawings analysed.
  • Route checked.
  • Report for approval.

Documents you will need

  • Scanner equipment data
  • Existing structural drawings
  • Floor plan with the scanner room
  • Delivery route plan

How it works

MRI floor check, step by step

1. Data

Equipment.

2. Drawings

Existing.

3. Analyse

Slab.

4. Route

Check.

5. Design

Spreader if needed.

6. Report

For approval.

Questions

MRI floor load: questions

Can my floor carry an MRI machine?

We check it from the equipment data and the existing structural drawings, and design a spreader or strengthening if needed.

Do you check the delivery route?

Yes, floors, doors and lifts on the way in.

Who designs the MRI shielding?

A specialist; we include its weight in our check.

What if there are no structural drawings?

We look at how the information can be obtained or surveyed. Contact us.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions checks floors for MRI and CT scanners in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.