Change of Use MEP Design in Dubai
Most of the cost and most of the comments in a change of use sit in the services: air, water, drainage and power.
A change of use in Dubai usually changes the building services. A restaurant needs kitchen exhaust, fresh air, gas and grease drainage; a clinic or salon needs more sinks and drainage points; a gym needs more cooling and fresh air; most new uses change the electrical load, which may need a DEWA load increase. The fire alarm and sprinklers are updated for the new layout. We prepare the MEP design for the new use with the layout and the structure, and submit it with the change of use and Civil Defence (DCD) approvals. Specialist systems, such as medical gas, are designed by their specialists and coordinated in our drawings.
By new use
What changes in the services
| New use | Main MEP changes |
|---|---|
| Restaurant or cafe | Exhaust, fresh air, gas, grease trap |
| Clinic | Sinks, drainage, ventilation |
| Gym | Cooling, fresh air, power |
| Salon or spa | Water points, drainage, ventilation |
| Office from restaurant | Kitchen services removed: restaurant to office |
Design areas
Our MEP design areas
| Area | Guide |
|---|---|
| HVAC | HVAC design |
| Plumbing and drainage | plumbing and drainage design |
| Fire alarm and sprinklers | fire alarm and sprinkler design |
| Power and DEWA load | electrical load approval |
Official sites: Dubai Municipality | DDA | Dubai Civil Defence
What you need to know
- Services change with the use.
- DEWA load may increase.
- Fire systems updated.
- Specialists coordinated.
Documents you will need
- Tenancy contract or title deed
- Landlord or building management NOC
- Existing approved drawings, if any
- Trade licence or initial approval for the new activity
How it works
Change of Use MEP Design in Dubai, step by step
1. Check
Is it possible?
2. NOC
Landlord.
3. Design
Drawings, MEP.
4. Structure
Load check.
5. Permits
Authority, DCD.
6. Complete
Inspection.
Questions
Change of Use MEP Design in Dubai: questions
Does a change of use need new MEP drawings?
Usually yes, because the new use changes the air, water, drainage, power and fire systems.
Do I need a DEWA load increase?
If the new use needs more power than the unit has. We calculate it.
Do you design medical gas for clinics?
No, medical gas is designed by its specialist; we coordinate it in our drawings.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions prepares MEP design for change of use in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
