Who Can Sign Off Old Works in Dubai?
Owners often assume only the original contractor can close the file. That is not the case.
Old works in Dubai are signed off by the authority that issued the permit, such as Dubai Municipality, DDA or Trakhees, after the developer and the authority inspect. The file is taken there by an approved consultant and a contractor approved by that authority. They do not have to be the original ones: if the original consultant or contractor is gone, a new one takes over the file and becomes responsible for it. The owner signs the owner letter. Where the works were built with no permit, they follow an as-built route; contact us to help you accordingly. We act as the consultant and take the file to completion.
Who does what
Roles in an old-works sign-off
| Role | Who | What they do |
|---|---|---|
| Consultant | Approved consultant (us) | Prepares the file, drawings and submissions |
| Contractor | Contractor approved by the authority | Signs for the works and fixes comments |
| Developer | Master developer or community | Inspects and issues its clearance |
| Authority | DM, DDA, Trakhees or the authority for the area | Inspects and issues the certificate |
| Owner | You | Signs the owner letter |
Official sites: Dubai Municipality | DDA | Trakhees
What you need to know
- Authority issues the certificate.
- New consultant can take over.
- New contractor too.
- Owner letter required.
Documents you will need
- Title deed
- Permit number
- Approved drawings, if any
- Owner letter
How it works
Who signs off, in order
1. Appoint
Consultant.
2. Check
File.
3. Contractor
If needed.
4. Prepare
Reports.
5. Inspect
Developer, authority.
6. Issue
Certificate.
Questions
Who signs off old works: questions
Can a different contractor sign off my old works?
Yes, a contractor approved by the authority can take over the file. See completion without the original contractor.
Can a different consultant take over?
Yes. See consultant change.
Does the developer sign off too?
The developer inspects; the authority issues the completion certificate.
Who signs off works built with no permit?
Those follow an as-built route. See works built without approval.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.