Food safety · Cloud kitchen · Updated November 2026

Cloud Kitchen Permit in Dubai

A cloud kitchen has no dining room, but it is still a food premises. The kitchen goes through the same approvals as a restaurant kitchen.

A cloud kitchen, also called a dark kitchen or delivery kitchen, needs the same food approvals as a restaurant kitchen in Dubai. The landlord or building management agrees to the use. Dubai Municipality Food Safety approves the kitchen layout, in every area of Dubai. The authority for the area issues the fit-out permit, and Civil Defence (DCD) approves the kitchen exhaust and fire safety. Before opening, DM Food Safety inspects the kitchen. If several brands cook from one kitchen, the layout shows how each brand works without crossing over. We check the unit, design the kitchen layout, exhaust and drainage, and submit the approvals.

Food layoutDM Food Safety
Fire safetyDCD
Several brandsShown in the layout

Approvals

Who approves a cloud kitchen

StepWhoGuide
NOC for the useLandlord or building managementthe fit-out NOC
Kitchen layoutDM Food Safetykitchen layout approval
Fit-out permitAuthority for the areaFood Safety in DDA, Trakhees and DSO areas
Exhaust and fire safetyDCDkitchen exhaust and DCD
Grease trapDrainage approvalgrease trap NOC
Inspection before openingDM Food Safetythe inspection before opening

Before you sign a lease

What we check in the unit

CheckWhy
Use allowedSome buildings and warehouses do not allow food
Exhaust routeA path to the roof or facade for the kitchen exhaust
DrainageA connection for a grease trap
Power and gasCooking load; LPG has its own approval: LPG approval
Pickup pointWhere riders collect orders
Floor loadCold rooms and heavy equipment

By area

Cloud kitchens in other setups

SetupGuide
TECOMTECOM cloud kitchen
Dark store or delivery kitchendark store and delivery kitchen
Question: do I need DM approval?DM approval for a cloud kitchen

Official sites: Dubai Municipality | Dubai Civil Defence

What you need to know

  • Same approvals as a restaurant kitchen.
  • DM Food Safety in every area.
  • DCD for exhaust.
  • Check the unit before the lease.

Documents you will need

  • Trade licence or initial approval
  • Tenancy contract or Ejari
  • Landlord NOC
  • Brands, menus and equipment list

How it works

Cloud kitchen permit, step by step

1. Check

Unit.

2. NOC

Landlord.

3. Design

Kitchen, MEP.

4. Food Safety

Layout.

5. Permits

Fit-out, DCD.

6. Open

Inspection.

Questions

Cloud kitchen permit: questions

Do cloud kitchens need a permit in Dubai?

Yes. The kitchen layout is approved by DM Food Safety, the fit-out by the authority for the area and the exhaust and fire safety by DCD.

Is there a minimum size for a cloud kitchen?

It depends on the menu, the brands and the equipment; the layout has to work for safe food preparation. We check your unit.

Can several brands use one cloud kitchen?

Yes, if the layout shows how each brand works safely. The brands are listed on the trade licence by the business owner.

Can I open a cloud kitchen in a warehouse?

Only if the use is allowed and the exhaust, drainage and fire safety can be provided. Contact us and we check the unit.

Is a cloud kitchen in TECOM different?

TECOM has its own fit-out route. See TECOM cloud kitchen.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions designs and gets approvals for cloud kitchens and delivery kitchens in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading