Telecom Tower Mapping and As-Built Survey in Dubai
Many towers have changed since they were built. Before any new antenna or a 5G upgrade, the analysis needs to start from what is really on the tower today.
Tower mapping is a site survey that records the tower as it stands: member sizes, bracing, connections and bolts, plus every antenna, radio, dish, mount and cable, with its height and position. We produce as-built drawings and an equipment list from the survey. Mapping is the starting point for a capacity assessment, an added-antenna check or a 5G upgrade, because old drawings rarely show the tower as it is now. Where the original drawings are missing completely, mapping replaces them.
What we record
Structure and equipment
| Item | What we measure |
|---|---|
| Members | Sizes and grades where visible |
| Bracing and connections | Pattern, plates and bolts |
| Antennas and radios | Type, size, height and direction |
| Dishes | Size and position |
| Mounts and cables | Brackets, feeders and ladders |
| Base | Base plate, anchor bolts or roof supports |
Why map first
What mapping is used for
| Job | Guide |
|---|---|
| Adding antennas | the structural check for added antennas |
| 5G upgrade | the 5G upgrade assessment |
| Capacity assessment | the capacity assessment |
| Condition check | the tower inspection |
Official sites: Dubai Municipality | DDA | TDRA
What you need to know
- Tower as it is today.
- Every item recorded.
- As-built drawings.
- Start of every upgrade.
Documents you will need
- Site location and access details
- Old drawings or mapping, if any
- Planned equipment, if known
- Owner or operator contact
How it works
Mapping steps
1. Brief
Site, purpose.
2. Access
Arranged.
3. Survey
Measure.
4. Equipment
Record.
5. Drawings
As-built.
6. Handover
For analysis.
Questions
Tower mapping: questions
What is tower mapping?
A survey that records the tower structure and every item of equipment on it.
Why not use the original drawings?
Towers change over the years. Mapping shows what is there now.
Do you map rooftop sites?
Yes, with the roof supports.
What do I get?
As-built drawings and an equipment list, ready for the structural analysis.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions maps telecom towers and prepares as-built drawings in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.