Steel Frame for Rooftop Telecom Equipment in Dubai
When the roof slab cannot carry the tower and cabinets directly, a steel frame (grillage) lifts them off the slab and puts the load onto the columns.
A rooftop steel frame, or grillage, carries telecom masts, antennas and cabinets above the roof and takes their load to the columns or main beams, away from the slab. We design the steel members, the connections and the column fixings, and check the columns for the extra load. The frame also takes the wind from the mast and keeps the roof waterproofing clear, with sealed fixings. We issue stamped calculations and fabrication-ready drawings.
Frame design
What we design
| Part | Detail |
|---|---|
| Main members | Beams spanning between columns |
| Secondary members | Supports for mast and cabinets |
| Column fixings | Plates and anchors |
| Mast base | Connection for the mast |
| Waterproofing | Sealed fixings at roof level |
Official sites: Dubai Municipality | DDA
What you need to know
- Off the slab.
- Onto columns.
- Wind from the mast.
- Fabrication drawings.
Documents you will need
- Building structural drawings
- Column positions on the roof
- Equipment list and layout
- Roof photos
How it works
Steel frame steps
1. Columns
Locate.
2. Layout
Equipment.
3. Frame
Design.
4. Columns
Check.
5. Details
Fixings.
6. Drawings
Stamped.
Questions
Steel frames: questions
When is a steel frame needed for a rooftop telecom site?
When the slab cannot carry the equipment directly.
Does the frame damage the roof?
The fixings are detailed and sealed to keep the waterproofing intact.
Do you check the columns?
Yes, for the extra load.
Who designs the steel?
We do. See steel structure calculations.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions designs steel frames for rooftop telecom equipment. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
