Telecom · Platforms · Updated November 2026

Telecom Equipment Shelter and Cabinet Platform Design in Dubai

The radios, batteries and power units of a telecom site sit in cabinets or a shelter. On a roof or raised ground, they need a platform designed for their weight.

We design steel platforms and supports for telecom cabinets and shelters, on roofs and on the ground. Battery cabinets and shelters are heavy for their size, so the platform spreads the weight to the beams or columns of the building rather than the middle of a slab. On the ground, we design the base or plinth. The platform also takes wind on the cabinets and gives safe access for maintenance. We issue stamped calculations and drawings for the steel and its connections.

CarriesCabinets and shelters
Spreads loadTo beams and columns
OutputStamped steel design

What we design

Platform scope

ItemDetail
Steel platformBeams, deck and bracing
SupportsOnto columns or beams of the building
Ground basePlinth or pad
AccessWalkway and handrail
ConnectionsBolts and welds

Official sites: Dubai Municipality | DDA

What you need to know

  • Heavy cabinets.
  • Load to beams and columns.
  • Access included.
  • Stamped drawings.

Documents you will need

  • Cabinet and shelter weights
  • Layout of equipment
  • Building drawings
  • Roof photos

How it works

Platform steps

1. Weights

Equipment.

2. Layout

On roof.

3. Support

Beams, columns.

4. Platform

Design.

5. Building

Check.

6. Drawings

Stamped.

Questions

Platforms: questions

Why do telecom cabinets need a platform?

They are heavy, so the load is spread to beams or columns instead of the slab.

Do you check the building under the platform?

Yes. See whether the roof can support a tower.

Can the platform include a walkway?

Yes, with handrails for maintenance.

Who designs the steel?

We do. See also steel structure calculations.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions designs platforms for telecom cabinets and shelters. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading