Lattice (Self-Supporting) Tower Structural Design in Dubai
A lattice tower is a steel frame of legs and bracing that stands on its own. It carries more equipment than a monopole and suits taller sites with space at the base.
We design self-supporting lattice towers in Dubai to TIA-222: the legs, the bracing pattern, the bolted joints, the platforms and ladders, and the foundations under each leg. Wind on the open frame and on the antennas sets the forces, so the bracing and the leg sizes are chosen together. Each leg footing is designed from the soil investigation. The tower needs the building permit from the authority for the area and the TDRA step, and near airports a height clearance from the Dubai Civil Aviation Authority (DCAA).
Design scope
What we design
| Part | What we check |
|---|---|
| Legs | Compression and uplift under wind |
| Bracing | Pattern and member sizes |
| Bolted joints | Bolts and plates at each panel |
| Platforms and ladders | Equipment, access and wind area |
| Foundations | One footing per leg, from the soil report |
Lattice or monopole
Which to choose
| Point | Lattice | Monopole |
|---|---|---|
| Equipment | More antennas and dishes | Fewer |
| Footprint | Wider base | Small |
| Look | Open frame | Single pole |
| Page | This page | monopole design |
Official sites: Dubai Municipality | DDA | Dubai Civil Aviation Authority
What you need to know
- Self-supporting frame.
- Footing per leg.
- More equipment.
- TIA-222 design.
Documents you will need
- Site plan
- Tower height and equipment list
- Soil investigation report
- Operator specification, if any
How it works
Lattice tower steps
1. Brief
Height, equipment.
2. Soil
Report.
3. Frame
Legs, bracing.
4. Joints
Bolts, plates.
5. Footings
Per leg.
6. Report
Stamped.
Questions
Lattice towers: questions
What is a lattice tower?
A self-supporting steel frame of legs and bracing.
When is a lattice tower used instead of a monopole?
When the site needs more equipment or more height and there is space at the base.
How are the foundations designed?
One footing per leg, designed from the soil investigation. See tower foundation design.
Does it need DCAA approval?
Near airports and flight paths, yes. See the DCAA height clearance.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions designs lattice towers and their foundations in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
