DCM Community NOC for a New Villa on a Meraas Plot
On the Meraas plots, DCM (Dubai Holding Community Management) is the master developer. Its community NOC on your villa design is the first approval after the plot rules.
The DCM community NOC is the master developer's approval of your villa design on a Meraas plot. DCM checks the drawings against the plot rules it issued with the affection plan: the floors, height, setbacks, coverage and floor area, and the look of the elevations. Only with this NOC can the design go to Civil Defence and then to DDA for the building permit. Meraas developed the plots but does not issue this NOC. We prepare the drawings and submit them to DCM for you.
What DCM reviews
The design check
| Item | Checked against |
|---|---|
| Floors and height | Plot rules |
| Setbacks and coverage | Plot rules |
| Floor area | Plot rules |
| Elevations and materials | Community character |
| Site plan, access and services | Community layout |
Later DCM NOCs
What DCM issues after the design
| NOC | Page |
|---|---|
| Site hoarding, access, night works | the site set-up NOCs |
| Sewerage connection | the sewerage connection |
| Vehicle access and gate level | villa access and gate level |
| Right of way works | the right of way NOC |
Communities
Where this applies
The same step applies on the Meraas plots in Pearl Jumeirah, Naia Island, Jumeirah Bay, La Mer, Al Wasl (Le Hemaira) and Umm Al Sheif.
| Community | Guide |
|---|---|
| Pearl Jumeirah | Pearl Jumeirah villa approvals |
| Naia Island | Naia Island villa approvals |
| Jumeirah Bay | Jumeirah Bay villa approvals |
| La Mer | La Mer villa approvals |
| Al Wasl (Le Hemaira) | Al Wasl (Le Hemaira) villa approvals |
| Umm Al Sheif | Umm Al Sheif villa approvals |
Official sites: DDA
What you need to know
- DCM issues it.
- Plot rules are the test.
- First design approval.
- Not Meraas.
Documents you will need
- Affection plan and plot rules
- Architectural drawings
- Site plan
- Title deed and owner ID
How it works
Getting the DCM NOC
1. Plot rules
From DCM.
2. Design
Within them.
3. Submit
To DCM.
4. Comments
We resolve.
5. NOC
Issued.
6. Next
DCD, DDA.
Questions
DCM NOC: questions
Who issues the design NOC on a Meraas plot?
DCM, the master developer.
Does Meraas issue it?
No. Meraas developed the plots; DCM issues the NOCs.
What happens if DCM comments on the design?
We revise the drawings and resubmit.
What comes next?
Civil Defence approval, then the DDA building permit.
How much does it cost?
Our fee depends on the drawings and the scope; we review your plot and advise. DCM, DDA, Civil Defence and service provider fees are separate, and we list them before you commit.
Who can help?
Structural Solutions handles every DCM, Civil Defence and DDA step for new villas on Meraas plots. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
