Do I Need a Trakhees Permit to Renovate a Shoreline Apartment?
A common question from Shoreline owners. The answer depends on what you change.
You need the Nakheel NOC for renovation works in the Shoreline Apartments. You also need a Trakhees permit when the works touch the structure, layout or MEP: removing or opening walls, moving a kitchen or bathroom, changing AC or ducting, merging two units or placing heavy items on the slab. Replacing finishes without changing the layout or services is a smaller scope; send us your list and we confirm what is needed.
Quick check
Your works and the permit
| Works | Trakhees permit? |
|---|---|
| Remove or open a wall | Yes |
| Move kitchen or bathroom | Yes |
| Change AC or ducting | Yes |
| Merge two apartments | Yes |
| Jacuzzi on the balcony | Structural check first |
| New finishes, same layout | We confirm for your scope |
Official sites: Trakhees | Dubai Civil Defence
What you need to know
- Nakheel NOC always.
- Trakhees for structure, layout, MEP.
- Finishes: we confirm.
- Ask first, then start.
Documents you will need
- List of works
- Photos
- Title deed
- Apartment number
How it works
How we answer it
1. Send
Your list.
2. Check
We confirm.
3. Apply
Nakheel, Trakhees.
Already done
Works already done without approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Trakhees permit: questions
Does a new kitchen need a Trakhees permit?
If the kitchen moves or the drainage, water or power changes, yes.
Does replacing floor tiles need a permit?
Send us the scope; we confirm what is needed.
What if I already started?
Who applies?
We apply to Nakheel and Trakhees for you.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise. Nakheel and Trakhees fees are separate.
Who can help?
Structural Solutions checks your Shoreline scope and applies for what it needs. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
