Shoreline Fit-Out Stopped or Done Without a NOC: How to Fix It
Works stopped by Nakheel, or a renovation finished without approval? There is a way to put it right.
If fit-out works in a Shoreline apartment were stopped, or finished without the Nakheel NOC or the Trakhees permit, the fix is to regularise them. We survey what was built, prepare as-built drawings and, where needed, structural calculations, then apply to Nakheel and Trakhees for the works as built. Some items may need changes on site before approval. A fine may apply.
Situations
Common situations and the fix
| Situation | Fix |
|---|---|
| Works stopped mid-way | Apply for the NOC and permit, then resume |
| Works finished without NOC | As-built route with Nakheel and Trakhees |
| Previous owner did the works | As-built route before selling or renting |
| Works differ from the NOC | Revise the drawings and the approval |
| Leak to the unit below | Repair, then check the approval status |
Official sites: Trakhees | Dubai Civil Defence
What you need to know
- Do not continue until approved.
- As-builts show what is there.
- Changes may be needed.
- A fine may apply.
Documents you will need
- Photos of the works
- Any drawings or approvals
- Title deed
- Notice from Nakheel, if any
How it works
Putting it right
1. Survey
What was built.
2. As-built
Drawings.
3. Apply
Nakheel, Trakhees.
4. Close
Completion.
Questions
Stopped works: questions
Nakheel stopped my fit-out. What now?
Stop the works, then we apply for the NOC and permit so the works can resume.
Can works done without a NOC be approved?
Many can, through the as-built route. Some may need changes.
Will there be a fine?
A fine may apply.
I bought the apartment with unapproved works. Can you help?
Yes, we regularise them. See renovated without Nakheel approval.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise. Nakheel and Trakhees fees are separate.
Who can help?
Structural Solutions regularises Shoreline works done without approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.