Sobha Hartland Villa Plot Rules: Height, Coverage, Roof and Style
The Development Control Regulations set the same core rules for every villa estate plot. Here they are in one table.
Every Sobha Hartland villa estate plot is G+1 with up to 50% ground coverage. GFA and setbacks are on each plot sheet. The roof is for MEP equipment, and domes or sloped roofs are not allowed. The plinth sits 300 mm above gate level and window openings are at least 2.40 m high. MEP equipment is screened. The style is contemporary and minimalist. Parking follows Dubai Municipality rules, with no overnight street parking.
Plot rules
What every villa estate plot allows
These rules come from the Sobha Hartland Development Control Regulations for villa estate plots. Setbacks and the GFA figure are on each plot sheet.
| Rule | Requirement |
|---|---|
| Height | G+1 |
| Ground coverage | Up to 50% of the plot |
| GFA and setbacks | As shown on your plot sheet and affection plan |
| Roof | For MEP equipment only; no domes or sloped roofs |
| Plinth | +300 mm from gate level |
| Windows | Minimum opening height 2.40 m |
| Style | Contemporary and minimalist, in line with the built villas |
| Accessories | Pergola, trellis, solar panels, carport, shade structures, pool house and gazebo within the plot |
| Kitchen | Electrical appliances only; LPG cylinders are not allowed |
| Parking | As per Dubai Municipality; no overnight street parking |
Official sites: Dubai Municipality
What you need to know
- Same core rules on all estate plots.
- GFA per plot sheet.
- Screen MEP equipment.
- Codes take precedence.
Documents you will need
- Plot sheet
- Affection plan
- Development Control Regulations
- Boundary wall sections
How it works
Using the rules
1. Read
Plot sheet.
2. Apply
Rules to the design.
3. Check
Before Sobha.
Questions
Plot rules: questions
Do these rules replace the building codes?
No. Local and international codes take precedence; the regulations add community rules.
Is the 50% coverage the same on every plot?
Yes, villa estate plots allow up to 50% ground coverage.
Can I build a sloped roof?
No.
Can I park on the street overnight?
No.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise. Sobha, Dubai Municipality and service provider fees are separate.
Who can help?
Structural Solutions checks your design against the plot rules before Sobha does. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
