Sobha Hartland Plot Design Submission: Drawings and Documents
A complete submission avoids rounds of comments. This is the list Sobha asks for on a villa estate plot.
For a Sobha Hartland villa plot, the design submission includes the consultant appointment letter, site and setting out plan, floor plans for every level, roof plan, sections and elevations, 3D perspective views, boundary wall design, interface design with the public realm and roads, and area, parking and utility calculations. It also needs a letter of undertaking that the utility loads are within the allocated limits and confirmation that the plot entry and exit follow the allocated access.
Checklist
The submission list
| Item | Note |
|---|---|
| Consultant appointment letter | Signed by the owner |
| Site and setting out plan | With setbacks |
| Floor plans | All levels |
| Roof plan | MEP equipment and screening |
| Sections and elevations | Heights and plinth |
| 3D perspective views | Massing and materials |
| Boundary wall design | To the plot sections |
| Public realm and road interface | Driveway and service outlets |
| Area, parking and utility calculations | GFA, coverage, loads |
| Utility load undertaking | Within the allocated limits |
| Access confirmation | Entry and exit as allocated |
Official sites: Dubai Municipality
What you need to know
- 11 items.
- PDF, CAD and hard copy.
- Title block on every sheet.
- Plot number on all letters.
Documents you will need
- Plot sheet
- Affection plan
- Infrastructure layout
- Owner details
How it works
Preparing the submission
1. Collect
Plot documents.
2. Draw
Full set.
3. Check
Against the rules.
4. Submit
To Sobha.
Questions
Submission: questions
What must the title block show?
The owner, all consultants, the master developer name and logo, signature or stamp, scale, and revision and date.
Do I quote the plot number?
Yes, the developer plot number goes on all correspondence with Sobha.
Do I need 3D views?
Yes, perspective views are part of the list.
What about the boundary wall?
Its design is part of the submission and follows the plot wall sections.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise. Sobha, Dubai Municipality and service provider fees are separate.
Who can help?
Structural Solutions prepares the full Sobha submission set. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
