Sobha Hartland · Question · Updated November 2026

What Can I Build on a Sobha Hartland Villa Plot?

Before you brief an architect, know the envelope: height, coverage, roof, style and the extras you can add inside the plot.

A Sobha Hartland villa estate plot allows a G+1 villa with up to 50% ground coverage. The GFA and setbacks are on your plot sheet and affection plan. The roof is for MEP equipment only, with no domes or sloped roofs. The design must be contemporary and minimalist, in line with the villas already built. Inside the plot you can add a pergola, trellis, solar panels, carport, shade structures, a pool house and a gazebo. LPG is not allowed, so the kitchen is electric.

HeightG+1
CoverageUp to 50%
StyleContemporary

Plot rules

What every villa estate plot allows

These rules come from the Sobha Hartland Development Control Regulations for villa estate plots. Setbacks and the GFA figure are on each plot sheet.

RuleRequirement
HeightG+1
Ground coverageUp to 50% of the plot
GFA and setbacksAs shown on your plot sheet and affection plan
RoofFor MEP equipment only; no domes or sloped roofs
Plinth+300 mm from gate level
WindowsMinimum opening height 2.40 m
StyleContemporary and minimalist, in line with the built villas
AccessoriesPergola, trellis, solar panels, carport, shade structures, pool house and gazebo within the plot
KitchenElectrical appliances only; LPG cylinders are not allowed
ParkingAs per Dubai Municipality; no overnight street parking

Design brief

What Sobha looks for in the design

TopicExpectation
PrivacyLimit overlooking into neighbouring villas
HeatMostly solid envelope, or high specification glass with shading
MaterialsStone, concrete, powder coated metal, glass, durable timber finishes
ColoursNeutral tones; accents in stone, timber or warm dark grey
LightingNeutral, concealed facade lighting; no coloured or animated lighting
MetalsBrushed or satin finishes; no highly reflective polished metal

Official sites: Dubai Municipality

What you need to know

  • G+1, 50% coverage.
  • No domes or sloped roofs.
  • Extras inside the plot.
  • No LPG.

Documents you will need

  • Plot sheet with GFA and setbacks
  • Affection plan
  • Development Control Regulations
  • Your brief

How it works

Starting the design

1. Read

Plot sheet.

2. Brief

Rooms and extras.

3. Massing

Within the rules.

4. Concept

To Sobha.

Questions

What you can build: questions

Can I build a G+2 villa?

No. Villa estate plots are G+1.

Can I use the roof as a terrace?

The roof is for MEP equipment only.

Can I add a pool house or gazebo?

Yes, within the plot limit.

Can I use gas for cooking?

No. LPG cylinders are not allowed; only electrical kitchen appliances.

Where are my setbacks?

On your plot sheet and the Dubai Municipality affection plan.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise. Sobha, Dubai Municipality and service provider fees are separate.

Who can help?

Structural Solutions reads your plot sheet and turns your brief into a design Sobha can approve. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading