Unit splitting · Mall owners · Updated November 2026

Splitting a Large Store Into Smaller Units

When a department store or supermarket leaves, malls and retail centres often divide the space into several smaller units. These are bigger jobs, led by the owner or leasing team.

Splitting a large store into smaller units in Dubai needs a full redesign of the space: new partition walls with fire separation, a corridor or new frontages so each unit has its own entrance, exits within the travel distance, and separate services for each unit. The mall or centre owner leads it. The authority for the area approves the works (Dubai Municipality, DDA or Trakhees) and Civil Defence approves the fire layout. We design the subdivision for the owner and handle the approvals.

ClientMall or centre owner
Key designAccess and exits
ApprovalsAuthority and DCD

Design

What a large store subdivision needs

ItemWhat we design
Layout of the new unitsSizes the leasing team can let
AccessNew mall frontages or a service corridor
ExitsEach unit within the travel distance
Fire separationRated walls between the units
ServicesPower, AC, sprinklers and alarm per unit
StructureChecks for new openings in the frontage

Phasing

Building it in phases

ApproachWhen it helps
Shell units firstTenants fit out their own unit later
Phase by phaseWhen parts are already let
One goWhen the whole space is empty

Official sites: Dubai Municipality | DDA | Trakhees | Dubai Civil Defence

What you need to know

  • Owner leads.
  • Access for every unit.
  • DCD approves.
  • Phasing possible.

Documents you will need

  • Existing store drawings
  • Leasing plan or target unit sizes
  • Mall or centre services drawings
  • Photos

How it works

From one big store to many units

1. Brief

Unit sizes.

2. Survey

Structure, services.

3. Design

Layout and fire.

4. Approvals

Authority, DCD.

5. Works

Shell units.

6. Tenants

Fit-outs.

Questions

Large store split: questions

Can a department store space be split into several shops?

Yes, with a new layout that gives each unit its own access, exits and services.

Who applies for the approvals?

The mall or centre owner, through its consultant. We do this for owners.

Do the new tenants need their own approvals?

Yes, each fit-out is approved separately.

What if only one tenant wants to split their unit?

See downsizing a leased mall unit.

What does a subdivision cost?

Our fee depends on the drawings and the scope; we review and advise. The works, the developer or mall fees and the authority fees are separate, and we list them for your unit before you commit.

Who can help?

Structural Solutions designs large store subdivisions for mall and centre owners. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading