Structural Test Reports Missing for the Completion Certificate
The authority or developer is asking for concrete test results or a structural report before closing the file, and the contractor does not have them. Here is what can be done.
Concrete cube results and other test records are normally kept during construction. When they are missing at completion, the authority or developer may accept tests on the built structure, such as concrete cores or non-destructive tests, and a structural report from the consultant, depending on the case. A testing laboratory carries out the tests; our engineers choose the tests and read the results.
Tests
Tests that may be used at completion
Which tests are needed depends on the case and on what the authority asks.
| Test | What it shows |
|---|---|
| Concrete cube results | Strength of concrete as cast (from construction records) |
| Concrete core test | Strength of the concrete in the built element |
| Rebound hammer and ultrasonic tests | Non-destructive checks of concrete quality |
| Cover meter and rebar scan | Position and cover of the steel bars |
| Load test | How a slab or beam behaves under a test load |
Report
The structural report
| Part | Content |
|---|---|
| Inspection | Our engineers inspect the built elements |
| Tests | A testing laboratory carries out the tests; our engineers choose the tests and read the results. |
| Assessment | Results checked against the approved design |
| Conclusion | Report for the authority or developer, with any repairs needed |
Official sites: Dubai Municipality | DDA | Trakhees
What you need to know
- Records first: ask the contractor and the lab for any results.
- Tests on site can replace some missing records.
- Engineer report ties the results together.
- Repairs: if results are low, we design the repair.
Documents you will need
- Any test results you have
- Approved structural drawings
- Authority or developer comment asking for reports
- Contractor and lab details
How it works
How we replace missing test reports
1. Comment
What is asked.
2. Records
Search what exists.
3. Plan tests
Our engineers.
4. Tests
Testing laboratory.
5. Report
Submitted with the file.
Questions
Test report questions
The authority wants cube test results and the contractor has none. What now?
Tests on the built structure and a structural report may be accepted, depending on the case. We plan them and prepare the report.
Who carries out the tests?
A testing laboratory carries out the tests; our engineers choose the tests and read the results.
Is a core test damaging?
It takes small samples from the element, which are then repaired. We choose locations that do not weaken the structure.
What if the results are low?
Our engineers assess the element and, if needed, design the strengthening or repair.
Does this delay the BCC?
It adds a step, but it is often what closes the file. The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.
How much does it cost?
It depends on the drawings and the scope. We review the file and advise.
Who can help?
Structural Solutions takes over stuck completion files. We audit the file, survey the works, prepare the as-built drawings and the owner letter pack, coordinate any contractor change and follow the developer and authority inspections until the completion certificate (BCC) is issued. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.