DDA · Foundation restoration · Updated November 2026

Foundation Restoration and Repair Approval (DDA)

Foundations suffer from groundwater, salts and settlement, and the damage often shows as cracks in the walls above. Foundation repairs need a repair design and, in DDA areas, DDA approval with the specialist stamp.

Foundation problems usually show in the walls above: diagonal cracks, sticking doors and uneven floors. We investigate with trial pits and tests, design the repair and take it to DDA with the concrete restoration stamp.

TypicalVillas with wall cracks
StampConcrete restoration
TestsBy a laboratory

Damage

Common foundation damage

Villas with wall cracks, buildings next to new excavations and plots with drainage problems.

DamageCause or sign
Cracks in walls abovePossible settlement
Salt and water attackConcrete and steel condition
Exposed footingsDuring works next door
Damage after leaksSoil washed out

Investigation

What we investigate

A testing laboratory carries out the tests; our engineers choose the tests and read the results.

CheckHow
Trial pitsFooting size and condition
Wall cracksPattern shows the movement
Leaks and drainageWater washing out soil
Concrete conditionBy a laboratory

Repair

How a foundation repair is designed

The DDA route is on the concrete restoration stamp page.

PartNotes
InvestigationTrial pits and tests
Concrete repairRepair mortar or concrete
Underpinning if neededWhere support is lost
Drainage fixesRemove the cause

Official sites: DDA | Dubai Building Code

What you need to know

  • Cause first: possible settlement.
  • Restoration stamp on the repair design.
  • Supervised repair works.
  • Needs more strength? See foundation strengthening.

Documents you will need

  • Photos of the foundation damage
  • Building details
  • Earlier reports, if any

How it works

Foundation repair, step by step

1. Survey

Trial pits.

2. Tests

Laboratory.

3. Design

Repair and method.

4. DDA

Stamp and approval.

5. Repair

Supervised.

Questions

Foundation restoration questions

Do I need DDA approval to repair a foundation?

Structural repairs do. We check your case and tell you if the repair is structural.

My neighbour's works cracked my wall. What now?

We assess and report, and recommend a contractor for the repair. See shared wall cracks.

Is the restoration stamp different from the strengthening stamp?

It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp.

Related guides

Keep reading