DDA · Steel review · Updated November 2026

DDA Steel Design Review and Approval

A steel design from a fabricator, a supplier or another engineer needs checking before it goes to DDA. We review the members and connections, revise where needed, coordinate the steel specialist stamp and submit.

We review steel designs by others against the loads, the codes and the existing structure they connect to, then coordinate the approved steel contractor (also called a steel specialist) stamp and submit to DDA. DDA may also ask for third-party verification.

ReviewMembers and connections
StampSteel specialist
SometimesThird-party verification

What we check

What the steel review covers

CheckWhy
Loads and membersSizes match the loads
ConnectionsSteel connection design
Base plates and anchorsBase plate and anchor design
Support structureExisting slab, beam or wall can carry it
Shop drawingsShop drawing approval

Official sites: DDA | Dubai Building Code

What you need to know

  • Steel specialist stamp needed on steel works.
  • We coordinate the stamp; we do not fabricate.
  • Existing structure checked too.
  • Third-party verification if DDA asks.

Documents you will need

  • Steel drawings
  • Calculations
  • Location and photos
  • Fabricator details

How it works

How the steel review works

1. Send

Drawings and calcs.

2. Review

Mark-ups.

3. Revise

Agreed changes.

4. Stamp

Steel specialist.

5. Submit

DDA.

Questions

Steel review questions

Can you review a fabricator's steel design for DDA?

Yes. We review it, revise what is needed and coordinate the stamp.

Who stamps the steel?

An approved steel contractor (also called a steel specialist). See steel specialist stamp for DDA.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading