DDA · Question · Updated November 2026

Who Can Stamp a Strengthening or Concrete Repair Design for DDA?

Two stamps go on a strengthening design in a DDA area: the consultant who submits the Building Modification, and a separate strengthening specialist stamp. Here is who does what.

DDA accepts submissions from consultants “registered with DDA”, in DDA's own words. For strengthening and repair, DDA also asks for a separate strengthening specialist stamp on the design. The contractor then needs the DDA No Objection before the structural works start. We submit as the consultant and coordinate the specialist stamp.

Stamp 1Submitting consultant
Stamp 2Strengthening specialist
ThenDDA No Objection for the contractor

Who does what

Roles on a DDA strengthening submission

RoleWhat they do
ConsultantAssesses, designs, submits the Building Modification and answers the DDA comments
Strengthening specialistStamps the strengthening design; see strengthening specialist stamp
Specialist contractorCarries out the works after the DDA No Objection
Testing labTests the concrete; the consultant chooses the tests and reads the results
OwnerGives the NOCs, the title deed and site access

Official sites: DDA | Dubai Building Code

What you need to know

  • DDA wording: consultants “registered with DDA” submit.
  • Specialist stamp: separate, on the strengthening design.
  • Contractor alone cannot submit the design.
  • We coordinate both stamps for you.

Documents you will need

  • Location and building
  • What needs strengthening and why
  • Any drawings or test results

How it works

How we get the design stamped and submitted

1. Tell us

Element and location.

2. Assess

Site and tests.

3. Design

By our engineers.

4. Stamps

Consultant and specialist.

5. Submit

To DDA.

Questions

Stamp questions

Can a contractor stamp the strengthening design?

No. The design is submitted by the consultant and carries the strengthening specialist stamp. The contractor carries out the works after the DDA No Objection.

Is the specialist stamp the same as the consultant stamp?

No. It is a separate stamp on the strengthening design.

Do you coordinate the specialist stamp?

Yes. We coordinate it as part of the submission.

Is this the same for steel works?

Steel works need the approved steel contractor (also called a steel specialist) stamp. See steel specialist stamp for DDA.

Who can help?

Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.