Structural Peer Review in Dubai: Independent Design Check
A second engineer checks the structural design before it is built.
A structural peer review is an independent check of a structural design by another engineer. Our engineers review the loads, the analysis model, the design of slabs, beams, columns and foundations, and the key details, then issue a clear report with comments by priority. We work for developers, owners, contractors and consultants on villas, buildings and industrial projects.

Official sources: Dubai Municipality
What we check
- Design: Drawings and calculations
- Loads: Dead, live, wind, seismic
- Model: Analysis and inputs
- Members: Slabs, beams, columns, foundations
- Codes: Design codes used
- Output: Review report and comments
Documents you will need
- Structural drawings and calculations
- The analysis model, if available
- Soil investigation report
- Architectural drawings and the project brief
Route
How it works, step by step
Who does what, from the first check to completion.
| Step | Approval route | Guides |
|---|---|---|
| Documents You or the design team | Drawings, calculations, the analysis model and the soil report. | — |
| Review Our engineers | Loads, model, member design, foundations and details checked. | — |
| Report Structural Solutions | Comments listed by priority, with what needs to change. | — |
| Response The design team | Revises the design or answers each comment. | — |
| Close-out Our engineers | Revisions checked and the review closed. | — |
How it works
How we work
1. Send the design
Drawings, calculations, model.
2. Scope
Full review or specific elements.
3. Review
Loads, model, members, foundations.
4. Report
Clear comments by priority.
5. Revisions
The designer responds.
6. Close-out
We check and close.
Related questions
What causes problems
- Reviewing drawings without the calculations behind them
- Wrong loads carried through the whole design
- Comments left open at construction
Need a second check?
Send us the design
Send us three things on WhatsApp:
- Drawings and calculations
- The analysis model, if any
- What worries you about the design
Our engineers review the design and give you a clear report with what to change.
Questions
Questions
What does a peer review cover?
Loads, analysis, member design, foundations and key details.
Who asks for one?
Developers, owners, contractors and design teams, for a second check.
Do you redesign the structure?
We review and comment; where asked, we can propose changes.
Can you review only part of the design?
Yes, for example the foundations or a transfer slab.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
