Architect of Record for Villa Designs in Dubai
You have a villa design, new or an extension, from an architect who is not an approved consultant in Dubai. We act as Architect of Record: we take the design through the developer NOC and the authority permit, with the structure and MEP signed by us.
Villa works in master communities start with the developer NOC, then the authority permit: for example Emaar villas in Arabian Ranches go to DDA, Nakheel villas go to Trakhees, and Jumeirah or Al Barsha villas go straight to Dubai Municipality. We sign the whole villa package.
Route by community
Who approves your villa design?
| Community | Route |
|---|---|
| Arabian Ranches, Dubai Hills Estate, The Valley | Emaar NOC, then DDA |
| Emirates Hills, Meadows, Springs, Lakes | Emaar NOC, then Dubai Municipality |
| Palm Jumeirah, Jumeirah Park, Jumeirah Islands | Nakheel NOC, then Trakhees |
| DAMAC Hills | DAMAC NOC, then DDA |
| Jumeirah, Umm Suqeim, Al Barsha, Mirdif | Dubai Municipality |
Villa works
Villa works we take on as Architect of Record
| Works | Guide |
|---|---|
| New villa | AoR for new buildings |
| Extension | Can I extend my villa? |
| Construction supervision | Villa supervision |
| Built works | As-built route |
Official sites: Dubai Municipality | DDA | Trakhees
What you need to know
- Community rules can limit size, height and setbacks.
- Developer NOC first in master communities.
- Structure is designed and signed by us.
- Your architect keeps the design.
Documents you will need
- Title deed
- Affection plan
- Villa design
- Existing villa drawings, for extensions
How it works
How we take a villa design to approval
1. Design
From your architect.
2. Rules
Community and codes.
3. Package
Architecture, structure, MEP.
4. Developer NOC
Where needed.
5. Permit
DM, DDA or Trakhees.
6. Completion
Inspections.
Questions
Villa AoR questions
My architect is abroad. Can you submit my villa design?
Yes. We act as the local Architect of Record and keep the design.
Do I need a developer NOC?
In master communities, yes, before the authority permit.
Can you supervise the construction?
Yes. See villa supervision.
Who can help?
Structural Solutions acts as Architect of Record: we sign the whole package, architecture, structure and MEP, submit it as the approved consultant and follow the comments until the approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
