Arabian Ranches · Emaar · Villa

Arabian Ranches Extension Fees: Villas and Townhouses

The Emaar rate depends on your home: villas have bands, townhouses have one flat rate.

Emaar charges on the added gross floor area (GFA), and the rate depends on the home. Villas, in Arabian Ranches 1 and the villa clusters of Arabian Ranches 2: AED 1,000 per sq ft up to 10%, then AED 3,000 per sq ft from 10% to 20% and AED 6,000 above 20%, subject to Emaar Management approval. Townhouses, in Arabian Ranches 2 and most of Arabian Ranches 3: a flat AED 1,000 per sq ft within the townhouse limits. Emaar confirms the amount during the NOC application. DDA permit fees are separate.

What we check first

  • Home type: Villa or townhouse
  • Existing area: From the plans
  • Added GFA: Every enclosed area
  • Band: For villas
  • Approval: Emaar Management above 10%
  • DDA: Separate fees

Documents you will need

  • Villa and plot number in Arabian Ranches
  • Title deed and owner ID
  • Photos of the villa and the area
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Emaar rates

Emaar rates in Arabian Ranches

Subject to Emaar review and Emaar Management approval.

Home and bandApproval routeGuides
Villas: up to 10%
AED 1,000 per sq ft
AR1 and AR2 villas. Emaar NOC review.—
Villas: 10% to 20%
AED 3,000 per sq ft
Subject to Emaar Management approval.—
Villas: above 20%
AED 6,000 per sq ft
Subject to Emaar Management approval.—
Townhouses
AED 1,000 per sq ft
AR2 townhouses and most of AR3. Flat rate within the townhouse limits.Townhouse rules
Emaar confirms
Emaar
The final amount during the NOC application.—
DDA permit
DDA
Separate fees.—

How it works

How it works

1. Send us the idea

Villa number, photos and what you want.

2. Villa plans

From Emaar, checked on site.

3. Early check

Rules, area and structure.

4. Drawings

Drawings and calculations.

5. Emaar NOC

We apply for you.

6. Permit

DDA, then works and completion.

What causes problems

  • Using the villa rate for a townhouse
  • Area measured wrongly
  • Assuming above 10% is automatic

Villa in Arabian Ranches?

Check your idea first

Send us three things on WhatsApp:

  1. Villa number
  2. Photos of the area
  3. What you want to do

We check the Emaar rules and the structure, then handle the Emaar NOC and the DDA permit.

Questions

Questions

Are townhouse fees different?

Yes. Townhouses pay a flat AED 1,000 per sq ft within the townhouse limits.

Which homes are villas?

Arabian Ranches 1 and the villa clusters of Arabian Ranches 2. Arabian Ranches 3 is mostly townhouses. We confirm your unit.

Are DDA fees included?

No, DDA permit fees are separate.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading