Taking over · Your question

Can I Use the Previous Tenant’s Food Layout Approval?

Taking over a restaurant or cafe that already had approval? The approval does not move to you.

No. When you take over a food unit, you need a new food layout approval under your own name, even if you change nothing. The existing layout helps: we survey the unit, check it against what is there, update the drawings for your activity and submit them. Civil Defence and the fit-out permit follow the same works.

What we prepare

  • Survey: The unit as it is
  • Old drawings: If available
  • Your activity: Menu and equipment
  • Updates: What you change
  • Submission: Under your name
  • Inspection: Before opening

Documents you will need

  • Trade licence or initial approval
  • Tenancy contract or title deed
  • Landlord, building or mall NOC (or we request it with you)
  • Your activity, menu and equipment list
  • Existing drawings, if available

Route

The approval route

The general route. We confirm it for your unit and area.

StepApproval routeGuides
Drawings
Structural Solutions
Food layout drawings: the layout, equipment and how food moves through the unit.Documents and drawings
NOC
Landlord, building or mall
Approval of the works. In communities the developer approves first; in malls, the mall management.—
DM Food Safety
Dubai Municipality
Food layout approval, submitted by us. It applies in DDA, Trakhees, DSO and DMCC areas too.—
Fit-out permit
Authority for the area
DM, DDA, Trakhees, DSO or DMCC, depending on where the unit is.Fit-out permit
Civil Defence
DCD
Fire and life safety approval for the fit-out.DCD for food outlets
Inspection
Dubai Municipality
Inspection before opening. Then the food safety remark on the trade licence is removed.Trade licence remark

How it works

How we get it approved

1. Send us the details

Area, unit, business and what you serve.

2. Site check

We measure the unit and check the services.

3. Drawings

Food layout and fit-out drawings.

4. Submission

DM Food Safety, the area authority and DCD, by us.

5. Comments

We answer them until approval.

6. Inspection

Before opening, then the licence remark is removed.

What causes problems

  • Opening under the old approval
  • Old drawings that do not match the unit
  • Changing equipment without telling anyone

Opening a food business?

Get your food layout approved

Send us three things on WhatsApp:

  1. Area, building and unit
  2. Your activity and menu
  3. Photos or existing drawings

We prepare the drawings and handle DM Food Safety, the fit-out permit and DCD.

Questions

Questions

Do I need a new approval if I change nothing?

Yes, under your name.

Can the old drawings be used?

They help. We check them against the unit and update them.

Is there an inspection?

Yes, before opening.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading