Shop · Adding a kitchen

Adding a Kitchen to a Retail Shop or Cafe in Dubai

Adding food preparation to a shop changes what the unit is approved for.

Adding a kitchen or food preparation to a retail shop needs the landlord or developer approval, a DM Food Safety layout approval, the fit-out permit from the authority for the area and Civil Defence approval. The trade licence activity has to match. Drainage, exhaust and the structure are checked. We prepare the drawings and submit them.

What we prepare

  • Activity: Licence matches
  • Layout: DM Food Safety
  • Exhaust: If cooking
  • Drainage: Sinks and grease trap
  • DCD: Fire and life safety
  • Structure: Openings and loads

Documents you will need

  • Trade licence or initial approval
  • Tenancy contract or title deed
  • Landlord, building or mall NOC (or we request it with you)
  • Your activity, menu and equipment list
  • Existing drawings, if available

Route

The approval route

The general route. We confirm it for your unit and area.

StepApproval routeGuides
Drawings
Structural Solutions
Food layout drawings: the layout, equipment and how food moves through the unit.Documents and drawings
NOC
Landlord, building or mall
Approval of the works. In communities the developer approves first; in malls, the mall management.—
DM Food Safety
Dubai Municipality
Food layout approval, submitted by us. It applies in DDA, Trakhees, DSO and DMCC areas too.—
Fit-out permit
Authority for the area
DM, DDA, Trakhees, DSO or DMCC, depending on where the unit is.Fit-out permit
Civil Defence
DCD
Fire and life safety approval for the fit-out.DCD for food outlets
Inspection
Dubai Municipality
Inspection before opening. Then the food safety remark on the trade licence is removed.Trade licence remark

How it works

How we get it approved

1. Send us the details

Area, unit, business and what you serve.

2. Site check

We measure the unit and check the services.

3. Drawings

Food layout and fit-out drawings.

4. Submission

DM Food Safety, the area authority and DCD, by us.

5. Comments

We answer them until approval.

6. Inspection

Before opening, then the licence remark is removed.

What causes problems

  • Licence activity not matching
  • No drainage or grease trap plan
  • Cooking without exhaust approval

Opening a food business?

Get your food layout approved

Send us three things on WhatsApp:

  1. Area, building and unit
  2. Your activity and menu
  3. Photos or existing drawings

We prepare the drawings and handle DM Food Safety, the fit-out permit and DCD.

Questions

Questions

Does the licence activity matter?

Yes, it must match the food activity.

Is a grease trap needed?

It is part of the drainage design we check.

Who approves first?

The landlord or developer.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading