Who Owns the Pavement in Front of My Shop?
Your lease covers the unit. The pavement outside usually belongs to someone else.
On a public road, the pavement is part of the right of way, controlled by RTA with the authority for the area. Inside a master community, the developer controls it. In a mall, it belongs to the mall. The lease rarely includes it, so using it needs that body’s approval. We confirm who controls the space in front of your shop.

Official sources: RTA · Dubai Municipality · DDA · Trakhees · Dubai Civil Defence
What decides it
- Lease: What it covers
- Plot line: Where the unit ends
- Right of way: Public pavement
- Community: Developer areas
Documents you will need
- Trade licence and lease
- Landlord or building NOC (or we request it with you)
- Photos of the unit and the space in front
- Existing drawings, if available
Route
The approval route
The general route. We confirm it for your shop and area.
| Step | Approval route | Guides |
|---|---|---|
| Developer or landlord Developer, building or mall | In communities the developer must approve first; in malls, the mall management. | — |
| RTA RTA | Use of the pavement or right of way on a public road. | RTA right of way NOC |
| Authority DM, DDA or Trakhees | The authority for the area approves the use and any structure. | — |
| Structure Consultant | Awnings, canopies, ramps and enclosures designed and checked. | Canopy calculations |
| Civil Defence DCD | Where exits or fire safety are affected. | — |
How it works
How we get it approved
1. Send us the details
Area, building, unit and what you want to add.
2. We confirm the route
Developer, RTA, authority and DCD.
3. Site check
Structure and the space.
4. Drawings
Layout, structure, fire safety.
5. Approvals
We submit and follow up.
6. Completion
Inspection, then you open.
Related questions
What causes problems
- Assuming the lease covers it
- Building on public land
- Skipping the developer
Extending your shop?
Get your route confirmed
Send us three things on WhatsApp:
- Area, building and unit number
- Photos of the unit and the space in front
- What you want to add
We confirm who approves it and handle the drawings and approvals.
Questions
Questions
Does my lease include the pavement?
Rarely. Check your lease; usually it ends at the shopfront.
Who controls a public pavement?
RTA, with the authority for the area.
What about communities?
The developer controls it.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
