Can I Extend My Salon Into the Next Unit?
Taking over the unit next door is the most common way salons grow.
Usually yes. Extending into the next unit follows the shop merging route: the owner and building NOC, a structural check of the wall between the units, the authority for the area: Dubai Municipality, DDA or Trakhees and Civil Defence. For a salon, the Dubai Municipality health and safety approval of the combined layout is added. We handle the whole route.

Official sources: RTA · Dubai Municipality · DDA · Trakhees · Dubai Civil Defence
What decides it
- Wall: Between the units
- Layout: Combined salon
- Plumbing: New basins
- Fire safety: Bigger unit
Documents you will need
- Trade licence and lease
- Landlord or building NOC (or we request it with you)
- Photos of the unit and the space in front
- Existing drawings, if available
Route
The approval route
The general route. We confirm it for your shop and area.
| Step | Approval route | Guides |
|---|---|---|
| NOC Landlord, building or developer | Approval of the salon extension. | — |
| Authority DM, DDA or Trakhees | The works and the new layout, submitted by us. | — |
| Health and safety Dubai Municipality | The salon layout is approved again for the extension. | — |
| Civil Defence DCD | Fire and life safety for the new layout. | DCD for salons |
| Completion Authority and DCD | Inspection before the extended salon opens. | — |
How it works
How we get it approved
1. Send us the details
Area, building, unit and what you want to add.
2. We confirm the route
Developer, RTA, authority and DCD.
3. Site check
Structure and the space.
4. Drawings
Layout, structure, fire safety.
5. Approvals
We submit and follow up.
6. Completion
Inspection, then you open.
What causes problems
- Wall removed without a check
- Layout not approved
- Exits for one unit only
Extending your salon?
Get your route confirmed
Send us three things on WhatsApp:
- Area, building and unit number
- Photos of the unit and the space in front
- What you want to add
We confirm who approves it and handle the drawings and approvals.
Questions
Questions
Is it the same as merging two shops?
Yes, plus the salon layout approval.
Do I need a structural check?
Yes, of the wall between the units.
Do you handle it?
Yes.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.