The Previous Owner Removed a Wall: Is It Structural?
Open-plan living, but nobody knows if the wall that went was holding something up.
It depends on what the wall carried. A wall can support a slab, a beam or the floor above. We check the structure around the opening, compare it with the approved drawings, look for cracks or sagging, and confirm whether support is needed. If the wall was structural and removed without approval, the as-built route applies. Contact us and we help you accordingly.

Official sources: Dubai Municipality · DDA · Trakhees · Dubai Land Department
What we look at
- Drawings: Was it load-bearing?
- Slab: Sagging or cracks
- Beams: Over the opening
- Approval: Was it approved?
Documents you will need
- Community and villa number
- The listing or photos
- Any drawings, NOCs or completion certificate from the seller
- Seller or agent contact for access
How we check
Our pre-purchase villa check
The general check. We adapt it to the villa and community.
| Step | Approval route | Guides |
|---|---|---|
| Records Developer or authority | The approved drawings, NOCs and permits on file for the villa. | Getting the drawings |
| Site survey Consultant | What is actually built, measured on site. | — |
| Comparison Consultant | Site against the approved drawings: what is approved and what is not. | As-built vs approved |
| Structure Structural engineer | Cracks, removed walls, added floors and loads. | Structural assessment |
| Report Consultant | What is approved, what is not, and what you can still build. | — |
How it works
How the check works
1. Send us the villa
Community, villa number and the listing.
2. Records
We request the approved drawings and records.
3. Site visit
Survey and structural check.
4. Comparison
Site against approved drawings.
5. Report
Findings and what you can build.
6. Next steps
Before or after you buy.
Related questions
What causes problems
- No check after removal
- Adding load above
- Ignoring sagging
Buying a villa?
Get it checked before you sign
Send us three things on WhatsApp:
- Community and villa number
- The listing or photos
- Any documents from the seller
We check the approvals and the structure and tell you what you can still build.
Questions
Questions
How do you know if it was load-bearing?
From the drawings and a site check.
What if it was?
We design the support and take it through the as-built route.
Can you check before I buy?
Yes.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.