Town Square and The Valley: Developer NOC Routes Compared

✍️ Written by our engineers🏛️ Dubai approvals guide✅ Independent consultant
Villa extension in Dubai — Structural Solutions

A Town Square and The Valley NOC both lead to a DDA permit, but the developer step is different. In Town Square, the NOC is applied for through the app or by email. In The Valley, it goes through the Emaar Community Portal, and Emaar provides the as-built plans.

Last checked: November 2026. Official sources: DDA · Emaar

Owners often compare these two communities, because both end at DDA. Here is what differs.

Side by side

StepTown SquareThe Valley
DeveloperNshamaEmaar
NOCThrough the app or by emailThrough the Emaar Community Portal
PlansHandover plans, or we surveyEmaar provides as-built plans
AuthorityDDADDA
At completionDeveloper and DDA inspectionsEmaar clearance and deposit, plus the DDA certificate

What is the same

  • Structural works need stamped calculations and the DDA permit
  • An approved consultant submits to DDA
  • Works must match the approved drawings
  • A signed owner letter is needed for the completion certificate

Guides for each community

See Town Square villa extensions, The Valley extensions and the The Valley completion certificate.

Who issues the permit in Town Square?

DDA, after the developer NOC.

Who issues the permit in The Valley?

DDA, after the Emaar NOC.

Does Emaar provide plans in The Valley?

Yes, Emaar provides the as-built plans.

Do both need a completion certificate?

Yes, for permitted works. DDA issues it.

Related service

NOC and DDA permit

We prepare the drawings and handle the NOC and DDA permit in both communities.

Town Square →The Valley →

Ask about your home

Need this approved?

Send us photos and the location. We will tell you which approvals apply and handle them for you.

Get a QuoteCall +971 55 339 4451

On this page

Have a question about your project?

Our engineers will tell you which developer NOC and authority approvals apply.

← Back to all guides