Maple Townhouse Garage Door and Side Openings
A Maple townhouse garage door must be automated and folding, and the garage stays parking. Side openings can be blocked, but the front cannot.
A Maple townhouse garage door must be an automated, folding, rectangular panel door with no windows, in traffic white (RAL 9016), white aluminum (RAL 9006), light ivory (RAL 1015) or oyster white (RAL 1013). Roller shutters and manual doors are not allowed. The garage must stay as car parking. Where a unit has an opening on the side of the garage, it can be blocked with block work, fixed windows or doors, or aluminum louvers that match the townhouse. The front of the garage cannot be blocked, and bins and DEWA meters must stay accessible. The garage roof cannot be changed.
Emaar’s guide
Garage rules in Maple
From Emaar’s Maple Townhouses guide (April 2022). Emaar reviews every application.
| Item | What the guide says |
|---|---|
| Door type | Automated folding rectangular panels, no windows |
| Colours | RAL 9016, RAL 9006, RAL 1015 or RAL 1013 |
| Not allowed | Roller shutters and manual doors |
| Use | Car parking only |
| Side openings | Block work with plaster and paint, fixed windows or doors, or matching aluminum louvers |
| Front | Cannot be blocked |
| Roof | No modifications |
Official sites: Emaar · Dubai Development Authority
Maple townhouse garage door and opening rules
- Roller shutters: Not allowed, because of noise.
- Change of use: Not allowed.
- Services: Bins and DEWA meters must not be blocked.
- Roof: No changes to the garage roof.
Documents you will need
- Title deed and owner ID
- Existing and proposed drawings and elevations
- Detailed scope of works
- Photos of the townhouse
- Contractor or consultant licence
- Building Completion Certificate
How it works
From idea to approval in Maple
1. Check
We check your idea against Emaar’s Maple guide and your plot.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved.
6. Completion
Emaar and DDA inspections, and the completion certificate.
Who does what
Who is involved
Structural Solutions
Checks your idea, prepares the drawings and stamped calculations, and handles the Emaar NOC and DDA permit. We are a consultancy, not Emaar or DDA.
Maple townhouse rules →Dubai Development Authority (DDA)
Issues the building permit for structural works, after the Emaar NOC.
DDA approvals →Maple guides
Why applications come back
- Design does not follow Emaar’s Maple guide
- Materials or colours do not match the townhouse
- Neighbour NOC missing where it is needed
- Works started before the NOC
Questions
Questions people ask
What garage door can I install?
An automated, folding, rectangular panel door with no windows, in one of the listed colours.
Can I use a roller shutter?
No, roller shutters and manual doors are not allowed.
Can I turn the garage into a room?
No, it must stay as car parking.
Can I block the side opening?
Yes, following the conditions in Emaar’s guide.