Maple Townhouse Balcony and Patio Enclosure
A Maple townhouse balcony and patio enclosure is possible within the 10% limit, as long as the elevation does not change.
A Maple townhouse balcony enclosure counts within the 10% maximum additional area, and the external elevation must not change. A balcony with an existing roof can be enclosed with non-reflecting glass and block wall. A balcony without a roof can be enclosed under the same conditions, with a new concrete roof and parapet at the existing level. The railings stay, there are no new windows overlooking neighbours, and no AC units on external walls. A rear ground floor patio can also be enclosed, within the inner ground floor building line and in matching materials. All of this is subject to Emaar review.
Emaar’s guide
Enclosure rules in Maple
From Emaar’s Maple Townhouses guide (April 2022). Emaar reviews every application.
| Item | What the guide says |
|---|---|
| Balcony with a roof | Can be enclosed with non-reflecting glass and block wall |
| Balcony without a roof | Same conditions, with a concrete roof and parapet level with the existing |
| Railings | Existing railings stay, and the elevation is kept |
| Windows | None overlooking a neighbouring unit or garden |
| AC units | None on the external walls |
| Rear patio | Within the inner ground floor building line, in matching materials and finishes |
| Limit | All count within the 10% allowable GFA |
Official sites: Emaar · Dubai Development Authority
Maple townhouse balcony enclosure: what the guide says
- Balcony with a roof: Non-reflecting glass and block wall.
- Balcony without a roof: New concrete roof and parapet at the existing level.
- Railings: Existing railings should not be removed.
- Structure: The structural integrity must not be compromised.
Documents you will need
- Title deed and owner ID
- Existing and proposed drawings and elevations
- Detailed scope of works
- Photos of the townhouse
- Contractor or consultant licence
- Building Completion Certificate
How it works
From idea to approval in Maple
1. Check
We check your idea against Emaar’s Maple guide and your plot.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved.
6. Completion
Emaar and DDA inspections, and the completion certificate.
Who does what
Who is involved
Structural Solutions
Checks your idea, prepares the drawings and stamped calculations, and handles the Emaar NOC and DDA permit. We are a consultancy, not Emaar or DDA.
Maple townhouse rules →Dubai Development Authority (DDA)
Issues the building permit for structural works, after the Emaar NOC.
DDA approvals →Maple guides
Why applications come back
- Design does not follow Emaar’s Maple guide
- Materials or colours do not match the townhouse
- Neighbour NOC missing where it is needed
- Works started before the NOC
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Questions
Questions people ask
Can I close my balcony in a Maple townhouse?
Yes, within the 10% limit, as long as the elevation does not change, subject to Emaar review.
Can I close a balcony with no roof?
Yes, with a concrete roof and parapet level with the existing.
Can I enclose my patio?
A rear ground floor patio, within the inner building line and in matching materials.
Does it count as extra area?
Yes, it counts within the 10%.
Related guides

