Can I Use Public Parking Bays for My Construction Site in Dubai?
Yes, but only after the RTA approves and Parkin reserves the bays. This applies to cranes, trucks and temporary site access.
Yes, with approval. A contractor can use public parking bays next to the site for a crane, concrete pump, delivery trucks or a temporary site access only after the RTA approves the use of the bays and Parkin reserves and blocks them. We prepare the layout drawing and handle the applications.
What you need to know
- Cranes and pumps: Shown on the layout with their position.
- Trucks: Standing on the bays needs a reservation.
- Site access: Blocked bays shown on the drawing.
Documents you will need
- Contractor trade licence
- Project details or building permit
- Layout of the bays to be used
- Crane, pump or truck position, where relevant
By situation
When it applies
We confirm the requirements for your project.
| Activity | Approval route | Guides |
|---|---|---|
| Crane or concrete pump RTA, then Parkin | Position on the layout. | Crane permit |
| Delivery trucks RTA, then Parkin | Standing on the bays. | Truck permit |
| Temporary site access RTA, then Parkin | Access over the bays. | — |
How it works
How it works
1. Layout
Bays and equipment position.
2. RTA
Approves the use of the bays.
3. Parkin
Reserves and blocks the bays.
4. Works
On the reserved bays only.
Who does what
Who approves it
Parkin
After the RTA approval, Parkin reserves and blocks the parking bays for the works.
Parking reservation →Structural Solutions
Prepares the layout drawing of the bays, the crane or truck position and the site access, and handles the applications.
Talk to our engineers →Why applications come back
- Bays not shown clearly
- Crane or truck position missing
- Lane closure needed but not applied for
Questions
Questions owners and developers ask
Do I need RTA approval to use parking bays for a crane?
Yes, then Parkin reserves the bays.
Can trucks unload from the parking bays?
Only once the bays are approved and reserved.
Who handles it?
We prepare the layout and apply for you.
Related guides
