Expo City · Question

Do I Need Civil Defence Approval in Expo City?

Yes, for restaurants, shops and offices. DCD approves the fire safety and inspects before opening.

Yes. Restaurant, shop and office fit-outs in Expo City need Dubai Civil Defence (DCD) approval, alongside the Expo City Dubai Authority (ECDA) approval. Every change to partitions, ceilings or decoration that affects fire safety goes to DCD, and DCD carries out a final inspection before the unit opens. Gas systems need DCD approval and a DCD-approved contractor.

Needed forRestaurants, shops, offices
WithECDA approval
Before openingDCD final inspection

What you need to know

  • Fire safety drawings: Sprinklers, alarm, exits and signs.
  • Final inspection: Before opening.
  • Gas: DCD approval and approved contractor.

Documents you will need

  • Trade licence and lease, or title deed for owners
  • Landlord or community NOC where applicable
  • Existing or as-built drawings of the unit
  • Fit-out or modification drawings, stamped by the consultant
  • Fire safety drawings for Civil Defence

By property

Approvals by type of property

We confirm the requirements for your unit.

PropertyApproval routeGuides
Restaurant or café renovation
ECDA, DCD and DM Food Safety
Kitchen layout and seating.Restaurants
Shop or retail fit-out
ECDA and DCD
Layout, ceilings, signage.Shops
Office fit-out
ECDA and DCD
Partitions and services.Offices
Villa or apartment
ECDA NOC and approval
Residential works.Homes

How it works

How we get your Expo City approval

1. Review

The unit, what you want to change and the drawings you have.

2. Drawings

Existing drawings, or a survey; then the fit-out or modification drawings.

3. ECDA

NOC and approval from Expo City Dubai Authority.

4. Civil Defence

Fire safety drawings approved by DCD.

5. Works

The works follow the approved drawings.

6. Inspection

DCD final inspection and completion before opening.

Who does what

Who approves works in Expo City

🏛️

Expo City Dubai Authority (ECDA)

Issues the NOCs and approvals for works in Expo City, as its free zone and community authority.

Who approves? →
🚒

Dubai Civil Defence

Approves fire safety for restaurants, shops and offices, and inspects before opening.

Civil Defence in Expo City →
🍽️

Dubai Municipality Food Safety

Restaurants and cafés also need the kitchen layout approved by Dubai Municipality (DM) Food Safety.

What we prepare

  • Fire safety drawings
  • DCD submission and inspection

Why Expo City submissions get returned

  • Drawings that do not match the unit
  • Fire safety changes without DCD approval
  • Kitchen layout not approved by DM Food Safety
  • Gas works without DCD approval
  • Works started before approval

Questions

Questions tenants and owners ask

Does my restaurant in Expo City need DCD approval?

Yes.

Does my shop need DCD approval?

Yes.

When does DCD inspect?

Before the unit opens.

Related guides

Keep reading