What Documents Do I Need for an Expo City NOC?
The licence or title deed, drawings of the unit, the proposed drawings and fire safety drawings for Civil Defence.
The short answer
For an Expo City Dubai Authority (ECDA) NOC you usually need your trade licence and lease (or title deed for owners), existing drawings of the unit, the proposed fit-out or modification drawings, and fire safety drawings for Dubai Civil Defence. Restaurants add the kitchen layout for Dubai Municipality (DM) Food Safety approval; structural changes add stamped calculations. We confirm the exact list for your unit.
What you need to know
- No drawings?: We survey the unit and draw it as built.
- Restaurants: Kitchen layout for DM Food Safety.
- Structure: Stamped calculations.
Documents you will need
- Trade licence and lease, or title deed for owners
- Landlord or community NOC where applicable
- Existing or as-built drawings of the unit
- Fit-out or modification drawings, stamped by the consultant
- Fire safety drawings for Civil Defence
By property
Approvals by type of property
We confirm the requirements for your unit.
| Property | Approval route | Guides |
|---|---|---|
| Restaurant or café renovation ECDA, DCD and DM Food Safety | Kitchen layout and seating. | Restaurants |
| Shop or retail fit-out ECDA and DCD | Layout, ceilings, signage. | Shops |
| Office fit-out ECDA and DCD | Partitions and services. | Offices |
| Villa or apartment ECDA NOC and approval | Residential works. | Homes |
How it works
How we get your Expo City approval
1. Review
The unit, what you want to change and the drawings you have.
2. Drawings
Existing drawings, or a survey; then the fit-out or modification drawings.
3. ECDA
NOC and approval from Expo City Dubai Authority.
4. Civil Defence
Fire safety drawings approved by DCD.
5. Works
The works follow the approved drawings.
6. Inspection
DCD final inspection and completion before opening.
Who does what
Who approves works in Expo City
Expo City Dubai Authority (ECDA)
Issues the NOCs and approvals for works in Expo City, as its free zone and community authority.
Who approves? →Dubai Civil Defence
Approves fire safety for restaurants, shops and offices, and inspects before opening.
Civil Defence in Expo City →Dubai Municipality Food Safety
Restaurants and cafés also need the kitchen layout approved by Dubai Municipality (DM) Food Safety.
What we prepare
- As-built survey
- Proposed and fire safety drawings
Why Expo City submissions get returned
- Drawings that do not match the unit
- Fire safety changes without DCD approval
- Kitchen layout not approved by DM Food Safety
- Gas works without DCD approval
- Works started before approval
Questions
Questions tenants and owners ask
What if I have no drawings of my unit?
We survey and draw it as built.
Do I need stamped drawings?
Yes, prepared by the consultant.
Related guides
