Expo City · Restaurants

Expo City Restaurant Renovation Approval: ECDA, Civil Defence and DM Food Safety

Renovating a restaurant or café in Expo City needs the ECDA approval, Civil Defence and the kitchen layout approved by Dubai Municipality Food Safety.

A restaurant or café renovation in Expo City needs the NOC and approval from Expo City Dubai Authority (ECDA), Dubai Civil Defence approval for fire safety, and the kitchen layout approved by Dubai Municipality (DM) Food Safety. Any change to the layout, seating or kitchen needs the layout approved again. Gas systems need DCD approval and installation by a DCD-approved contractor; electric-only kitchens need an undertaking letter to DCD. DCD inspects before the restaurant opens.

NOCECDA
AlwaysCivil Defence
KitchenDM Food Safety layout approval

What you need to know

  • Layout changes: Seating, kitchen and counters need approval again.
  • Kitchen exhaust: Hood and duct shown on fire safety drawings.
  • Gas: DCD approval and a DCD-approved contractor.
  • Electric only: Undertaking letter to DCD.
  • Opening: After the DCD final inspection.

Documents you will need

  • Trade licence and lease, or title deed for owners
  • Landlord or community NOC where applicable
  • Existing or as-built drawings of the unit
  • Fit-out or modification drawings, stamped by the consultant
  • Fire safety drawings for Civil Defence

By property

Your restaurant works

We confirm the requirements for your unit.

WorksApproval routeGuides
New layout or seating
ECDA, DCD, DM Food Safety
Drawings updated.Layout change
Kitchen change
DM Food Safety and DCD
Exhaust and equipment.—
Gas system
DCD
DCD-approved contractor.—
Signage
ECDA
Design and fixing.—

How it works

How we get your Expo City approval

1. Review

The unit, what you want to change and the drawings you have.

2. Drawings

Existing drawings, or a survey; then the fit-out or modification drawings.

3. ECDA

NOC and approval from Expo City Dubai Authority.

4. Civil Defence

Fire safety drawings approved by DCD.

5. Works

The works follow the approved drawings.

6. Inspection

DCD final inspection and completion before opening.

Who does what

Who approves works in Expo City

🏛️

Expo City Dubai Authority (ECDA)

Issues the NOCs and approvals for works in Expo City, as its free zone and community authority.

Who approves? →
🚒

Dubai Civil Defence

Approves fire safety for restaurants, shops and offices, and inspects before opening.

Civil Defence in Expo City →
🍽️

Dubai Municipality Food Safety

Restaurants and cafés also need the kitchen layout approved by Dubai Municipality (DM) Food Safety.

What we prepare

Why Expo City submissions get returned

  • Drawings that do not match the unit
  • Fire safety changes without DCD approval
  • Kitchen layout not approved by DM Food Safety
  • Gas works without DCD approval
  • Works started before approval

Questions

Questions tenants and owners ask

Do I need approval to renovate my restaurant in Expo City?

Yes: ECDA, Civil Defence and the DM Food Safety layout approval.

Who approves the kitchen layout?

Dubai Municipality (DM) Food Safety.

Is DCAA approval needed?

No, not in Expo City.

Does a restaurant in Expo City need Civil Defence approval?

Yes, and a DCD inspection before opening.

Do I need approval to change the seating?

Yes, layout changes need approval again.

What about gas?

DCD approval and a DCD-approved contractor.

Related guides

Keep reading