Dubai Holding vehicle access and gate level NOC: driveways and gates
A new driveway, a wider gate or a second vehicle access in a Dubai Holding community starts with the gate level and permanent vehicle access (design) NOC, then construction, then completion, followed by the RTA NOC. Vehicle access design is one of our main services: we survey, design the levels and submit.
The short answer
Vehicle access has three NOCs on the Dubai Holding Community Management portal. The design NOC approves the access position and the gate level: the levels of the gate and driveway against the road, kerb and footpath, so the access fits the road and drains properly. The construction NOC covers the works outside the plot. The completion NOC follows the inspection. The RTA NOC is needed after the community NOC.

Official sources: Dubai Holding Community Management NOC portal · Roads and Transport Authority
When you need a vehicle access NOC
- New driveway: A new vehicle access to the plot
- Wider gate: Widening the gate or driveway
- Second access: A second driveway or gate
- Kerb: Lowering or changing the kerb
- Gate level: Changing gate or driveway levels
- Footpath: Works across the footpath
Documents you will need
- Survey of the plot and road side (we do this)
- Access layout and gate level drawings (we prepare these)
- Kerb and footpath details
- Title deed and affection plan
- Owner letter
- Contractor trade licence
NOC types
The three vehicle access NOCs
Applied for in this order, then RTA.
| NOC | Approval route | Guides |
|---|---|---|
| Gate level and permanent vehicle access (design) Dubai Holding | Access position and the levels from road to gate. | — |
| Permanent vehicle access construction Dubai Holding | The works outside the plot. New or renewal. | — |
| Gate level and permanent vehicle access (completion) Dubai Holding | Issued after the works are inspected. | — |
| RTA NOC RTA | For the road side, after the community NOC. | RTA NOC guide |
How it works
How we get it done
1. Survey
Plot, road, kerb, footpath and services.
2. Access design
Position, gate level and driveway levels.
3. Design NOC
Gate level and vehicle access (design).
4. RTA NOC
For the road side.
5. Construction NOC
Then the works.
6. Completion
Inspection and completion NOC.
What owners ask us about
Common reasons for comments
- Levels that do not match the road or footpath
- No survey of the road side
- Access clashing with street lights, trees or services
- Construction started before the design NOC
New driveway or wider gate?
Get your vehicle access designed and approved
Send us three things on WhatsApp:
- Your community and plot number
- Photos of the gate and road side
- What you want to change
We survey, design the gate levels and handle the Dubai Holding and RTA NOCs.
Questions
Questions
Do I need a NOC for a new driveway in a Dubai Holding community?
Yes. The gate level and vehicle access design NOC, then the construction NOC, then completion, with the RTA NOC after the community NOC.
What is a gate level approval?
Approval of the levels of your gate and driveway against the road, kerb and footpath, so the access fits the road and drains properly.
What drawings are needed for vehicle access design?
A survey of the plot and road side, the access layout, the gate and driveway levels, and the kerb and footpath details. We prepare all of them.
Do I need a survey?
Yes. The levels must come from a survey of the plot and road side. We do it.
Can I widen my gate?
Yes, through the same design, construction and completion NOCs.
Can I add a second driveway?
It goes through the same NOCs and is reviewed against the road layout. We check it before designing.
Can I lower the kerb outside my villa?
Kerb changes are part of the vehicle access design and construction NOCs.
Do I also need an RTA NOC?
Yes, for works on the road side. The RTA NOC follows the Dubai Holding NOC.
What if a street light or tree is in the way?
It has to be dealt with in the design; relocating services needs its own NOC. We check this at the survey.
What happens at completion?
The finished access is inspected and the completion NOC is issued.
I already built the driveway without a NOC. What now?
We survey what was built and advise how to apply for approval.
Do the gate and boundary wall need a building permit too?
If you change the boundary wall or gate structure, the authority permit for your area may apply. We check.
Who can apply for a Dubai Holding NOC?
Only registered consultants and contractors can apply on the Dubai Holding Community Management NOC portal. Owners cannot apply themselves. We are registered and submit for our clients.