HVAC design for a retail fit-out in Dubai

HVAC design for a retail fit-out in Dubai covers the cooling load, the AC layout and the connection to the mall or building supply, stamped for approval.

Our HVAC design for shops, boutiques and showrooms starts with the cooling load calculation, from the floor area, lighting, people and display equipment. We then lay out the fan coil units or ducted AC, diffusers and fresh air, connected to the mall chilled water or the building AC system as the landlord guide requires, and coordinate it with the ceiling, sprinklers and lighting. The drawings are stamped for the mall and Civil Defence (DCD).

IncludesCooling load and layout
Connects toMall or building supply
Approved byMall and DCD

HVAC design for a retail fit-out: what you need to know

  • Cooling load: Calculated from area, lighting, people and equipment.
  • Layout: Units, ducts, diffusers and fresh air.
  • Coordination: With ceiling, sprinklers and lighting.
  • Tenant guide: Follows the mall or landlord requirements.

What to send us

  • Interior design layout and ceiling plan
  • Mall or landlord fit-out guide
  • Lease or tenancy contract
  • Trade licence
  • Existing MEP drawings, if available

Who does what

From design to opening

We confirm the exact route for your mall or building.

StepApproval routeGuides
MEP design and calculations
Structural Solutions
HVAC, lighting and power, fire alarm, sprinklers, plumbing, with calculations.MEP package
Landlord or mall approval
Consultant → mall or landlord
Stamped drawings reviewed by the mall or landlord fit-out team.Consultant stamp
Authority permit, where needed
Consultant → DM, DDA or Trakhees
Depending on the area and the mall or building.Authority permit
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval, needed for every fit-out change.DCD approval
Final inspection
Mall, authority and DCD
DCD final inspection and completion before opening.Sign-off

How it works

How it works

1. Brief

Layout, ceiling plan and the landlord guide.

2. Design

MEP design and calculations.

3. Approvals

Mall or landlord, authority and DCD.

4. Handover

Final inspection and completion.

Questions

More questions about HVAC design for a retail fit-out

Do you size the AC units?

Yes, from the cooling load calculation.

Can I keep the existing AC?

We check whether it suits the new layout and load.

Does HVAC need DCD approval?

The fire and smoke side is part of the DCD review.

Do you prepare a BOQ?

No, we prepare the design and calculations.