Fit-Outs · MEP Design

Lighting design and lux calculations for retail shops in Dubai

Lighting design and lux calculations for a retail shop set the light levels, fittings layout and electrical load, prepared for mall approval.

We design shop lighting with lux calculations: general lighting, display and accent lighting, and emergency lighting. The calculations show the light levels across the sales floor and fitting rooms, and the lighting load feeds into the electrical load schedule. Emergency and exit lighting are coordinated with the fire safety design for Civil Defence (DCD).

IncludesLux calculations
CoversGeneral, display, emergency
FeedsElectrical load

Lighting design and lux calculations: what you need to know

  • Light levels: Calculated across the shop.
  • Display lighting: Often the biggest load in a boutique.
  • Emergency lighting: Part of the DCD review.
  • Coordination: With the interior design and ceiling.

What to send us

  • Interior design layout and ceiling plan
  • Mall or landlord fit-out guide
  • Lease or tenancy contract
  • Trade licence
  • Existing MEP drawings, if available

Who does what

From design to opening

We confirm the exact route for your mall or building.

StepApproval routeGuides
MEP design and calculations
Structural Solutions
HVAC, lighting and power, fire alarm, sprinklers, plumbing, with calculations.MEP package
Landlord or mall approval
Consultant → mall or landlord
Stamped drawings reviewed by the mall or landlord fit-out team.Consultant stamp
Authority permit, where needed
Consultant → DM, DDA or Trakhees
Depending on the area and the mall or building.Authority permit
Civil Defence (DCD)
Structural Solutions → DCD
Fire and life safety approval, needed for every fit-out change.DCD approval
Final inspection
Mall, authority and DCD
DCD final inspection and completion before opening.Sign-off

How it works

How it works

1. Brief

Layout, ceiling plan and the landlord guide.

2. Design

MEP design and calculations.

3. Approvals

Mall or landlord, authority and DCD.

4. Handover

Final inspection and completion.

Questions

More questions about lighting design and lux calculations

Do you do lux calculations?

Yes.

Do you choose the fittings?

We design the layout and performance; the designer selects the look.

Is emergency lighting included?

Yes, for DCD.

Does lighting affect DEWA?

Only if the total load needs an increase, which is rare in malls.

Related guides

Keep reading