Dubai Silicon Oasis · DEWA

DEWA load increase in Dubai Silicon Oasis

A higher electrical load for a DSO unit needs DEWA approval, with the load details and the fit-out approvals.

If your Dubai Silicon Oasis unit needs more electrical power, for example for equipment, a kitchen or a server room, the load increase needs DEWA approval, with the existing and new load details. The fit-out itself still needs the building NOC, the DSO Authority permit and DCD approval. Structural Solutions coordinates the load increase with the fit-out approvals.

ApprovalDEWA
NeedsExisting and new loads
PlusFit-out approvals

What you need to know

  • Load increase: Needs DEWA approval.
  • Equipment: Kitchens, servers and machinery.
  • Fit-out: DSO Authority and DCD as usual.
  • Coordination: With the building management.

Documents you may need

  • Trade licence and tenancy contract (Ejari)
  • Building management or landlord NOC
  • Unit plan and existing drawings
  • Fit-out drawings: architectural, MEP and fire safety
  • Photos of the unit

Who does what

Step by step

We confirm the route for your unit.

StepApproval routeGuides
Building or landlord NOC
Building management or landlord
Approval of the works in the building or unit.Building management NOC
Drawings and calculations
Structural Solutions
Architectural, MEP, fire safety drawings and stamped calculations where needed.Which drawings?
DSO Authority permit
Consultant or contractor → DSOA (DIEZ)
The fit-out or building permit for the works.DSO fit-out approval
DCD approval
Structural Solutions → DCD
Fire and life safety approval for every commercial fit-out change.DSO and DCD
Inspection and completion
DSO Authority and DCD
Final inspections and the completion certificate.Completion

Questions

Related questions

Do I need DEWA approval for more power?

Yes, for a load increase.

Does the building management need to agree?

Yes, as part of the building NOC.

Does solar need DEWA?

Yes, solar connections need DEWA approval.

Can you coordinate it?

Yes.

Related guides

Keep reading