Dubai Silicon Oasis · Structural Calculations
Do I need structural calculations for a DSO fit-out?
When the fit-out adds loads, openings, a mezzanine, racking or heavy equipment, yes.
Yes, when the fit-out in Dubai Silicon Oasis adds loads or changes the structure, for example a mezzanine, racking, heavy equipment, a new slab opening, a server room or a steel structure. The calculations check the slab, beams and connections and are stamped for the DSO Authority submission; steel works also need specialist verification and a stamp. Structural Solutions prepares the calculations.
Needed forLoads, openings, mezzanines
ChecksSlab, beams, connections
SteelSpecialist stamp
What you need to know
- Mezzanines: Need stamped calculations.
- Equipment: Floor load checks.
- Openings: New slab openings need design.
- Steel: Specialist verification and stamp.
Documents you may need
- Trade licence and tenancy contract (Ejari)
- Building management or landlord NOC
- Unit plan and existing drawings
- Fit-out drawings: architectural, MEP and fire safety
- Photos of the unit
Who does what
Step by step
We confirm the route for your unit.
| Step | Approval route | Guides |
|---|---|---|
| Building or landlord NOC Building management or landlord | Approval of the works in the building or unit. | Building management NOC |
| Drawings and calculations Structural Solutions | Architectural, MEP, fire safety drawings and stamped calculations where needed. | Which drawings? |
| DSO Authority permit Consultant or contractor → DSOA (DIEZ) | The fit-out or building permit for the works. | DSO fit-out approval |
| DCD approval Structural Solutions → DCD | Fire and life safety approval for every commercial fit-out change. | DSO and DCD |
| Inspection and completion DSO Authority and DCD | Final inspections and the completion certificate. | Completion |
Questions
Related questions
Does a simple office fit-out need calculations?
Not if nothing structural changes.
Does a server room need a check?
Heavy equipment may need a floor check.
Who stamps them?
Our engineers.
Do steel works need more?
Specialist verification and a stamp.