Unapproved works

Can I get a building permit for works already done?

Often yes, as a retrospective approval. The works are surveyed, as-built drawings and a structural check are prepared, and the package is submitted to the developer and authority. Works that cannot be approved must be changed or removed.

Retrospective approval is common for extensions, pergolas, rooms or removed walls built without approval, by you or a previous owner. The developer and authority review the as-built drawings and structural report, may ask for changes, then approve and inspect.

Often possibleRetrospective approval
NeededSurvey, as-built, structural check
OtherwiseChange or remove the works

Works finished?

Request your completion certificate online. Tell us what was done, upload your documents, and we initiate the sign-off with the relevant developer and authority on your behalf.

Request sign-off online →

What you need to know

  • Survey: Measured survey of the works.
  • As-built drawings: Show what was built.
  • Structural check: Confirms the works are safe.
  • Decision: Approve, change or remove.

Documents you will need

  • Title deed and owner ID
  • Affection plan for the plot
  • Developer NOC where the community has a developer
  • Existing drawings or as-built plans
  • Photos of the area

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Survey
Structural Solutions
Measure the existing works.As-built drawings
Structural check
Structural Solutions
Stamped report.Structural reports
Retrospective approval
Developer and authority
Review and approval.Retrospective NOC
Completion
Inspectors
Inspection and completion.—

Questions

Related questions

Can a previous owner's works be approved?

Often yes, through the same process.

What if the works break community rules?

They may need to be changed or removed.

Is a structural report needed?

Usually yes.

Will it affect selling?

Approving the works avoids sale delays.

What does Structural Solutions do?

Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.

Related guides

Keep reading