DDA

What documents does DDA need for a villa modification?

Usually the title deed and owner ID, the affection plan, the developer NOC (for example the Emaar NOC), and drawings with stamped structural calculations prepared by an approved consultant.

For a villa modification in a DDA community, the submission is built on ownership documents, the developer NOC and the technical package. The developer often provides the as-built plans, for example Emaar provides them in its communities, and our engineers base the drawings and calculations on them.

OwnershipTitle deed and owner ID
DeveloperThe developer NOC
TechnicalDrawings and stamped calculations

Documents explained

  • Developer NOC: For example the Emaar NOC.
  • As-built plans: Often provided by the developer; Emaar provides them.
  • Affection plan: The official plot plan from the authority.
  • Pools: The DM Environment Department pool NOC as well.

Documents you will need

  • Title deed and owner ID
  • Affection plan for the plot
  • Developer NOC (where the community has a developer)
  • Drawings and stamped structural calculations
  • Photos of the area

Who does what

Step by step

The order can vary by community and authority; we confirm it for your project.

StepApproval routeGuides
Ownership documents
You
Title deed and owner ID.—
As-built plans
Developer
The existing villa plans.—
Developer NOC
Developer
Approval of the modification.—
Drawings and calculations
Consultant
Prepared and stamped for DDA.Structural calculations

Questions

Related questions

Does Emaar provide the villa plans?

Yes, Emaar provides as-built plans in its communities.

Do I need the affection plan?

Yes, for the drawings and the permit.

Is the developer NOC part of the DDA submission?

Yes, it comes first and is part of the package.

Who prepares the drawings?

The approved consultant.

What does Structural Solutions do?

We prepare and submit everything as approved consultant.

Related guides

Keep reading