DCD Rejected My Restaurant Extension: What Now?
Read the comments, fix the drawings, resubmit. A Dubai Civil Defence rejection of a restaurant extension usually comes with comments about exits, travel distances, fire alarm, sprinklers or the kitchen. The drawings are corrected to answer each comment and resubmitted.
Do not start or continue works on the extension while DCD approval is open. Send us the rejection comments and the drawings. Our engineers check each comment, change the layout or fire drawings, and resubmit.
Common comments
What DCD comments often cover
General areas only. Your comments decide the fix.
| Area | Typical fix |
|---|---|
| Exits | Layout changed so exits and routes stay clear |
| Seat numbers | Seats matched to the exits available |
| Fire alarm and sprinklers | Coverage extended to the new area |
| Kitchen | Hood, gas and suppression details completed |
| Drawings | Missing or unclear sheets added |
Official sites: Dubai Municipality | Dubai Civil Defence | DDA
What you need to know
- Comments are the brief: answer each one.
- Seats and exits are linked.
- Fire systems must cover the new area.
- No works until approval.
Documents you will need
- Trade licence
- Tenancy contract or Ejari
- Currently approved food layout
- Photos of the unit and the area
- DCD rejection comments
- Submitted drawings
How it works
How we handle it
1. Comments
Send them to us.
2. Review
Each comment checked.
3. Fix
Layout or fire drawings changed.
4. Resubmit
To DCD.
5. Food Safety
Updated if the layout changed.
6. Inspection
Before the new area opens.
Already done
Works done before DCD approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Questions after a DCD rejection
Why did DCD reject my restaurant extension?
The comments say why. Often exits, seat numbers, fire alarm or sprinkler coverage, or kitchen details.
Can I resubmit after a DCD rejection?
Yes. The drawings are corrected to answer each comment and resubmitted.
Does a DCD change affect Food Safety?
If the layout changes, Food Safety re-approves the updated layout.
Who can help?
We prepare the drawings and stamped calculations and submit the approvals for you. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
