Do I Need DCD Approval for a Restaurant Extension?
Yes. Every restaurant, shisha or smoking area proposal needs Dubai Civil Defence (DCD) approval, including extensions. DCD reviews the escape routes, fire alarm, sprinklers, kitchen fire suppression and gas for the extended restaurant, then inspects before the new area opens.
DCD approval is needed for every restaurant extension, small or large: more seats, a terrace, a bigger kitchen, a mezzanine or a merged unit. Gas works also need a DCD-approved third-party contractor.
What DCD looks at
What DCD checks in an extension
| Item | What is checked |
|---|---|
| Escape routes | Exits and travel distances for the new seat count |
| Fire alarm and sprinklers | Coverage of the new area |
| Kitchen fire suppression | For new or moved cooking lines; see kitchen exhaust |
| Gas | DCD approval and a DCD-approved contractor |
| Shisha or smoking area | Separate approval; see shisha areas |
Official sites: Dubai Municipality | Dubai Civil Defence | DDA
What you need to know
- No exceptions: every restaurant proposal needs DCD.
- Gas works by a DCD-approved third-party contractor.
- Food Safety re-approval runs alongside.
- Inspection before the new area is used.
Documents you will need
- Trade licence
- Tenancy contract or Ejari
- Currently approved food layout
- Photos of the unit and the area to be added
- Your idea: a sketch of the change
- Existing fire safety drawings if available
How it works
How we handle it
1. Review
Current fire safety layout.
2. Design
Updated fire and life safety drawings.
3. Coordination
Alarm, sprinklers, suppression, gas.
4. Submission
DCD submission.
5. Comments
We answer DCD comments.
6. Inspection
DCD inspection.
Already done
Works already done without approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Questions owners ask
Does a small restaurant extension need DCD?
Yes. Every restaurant proposal needs DCD approval.
Does adding seats need DCD?
Yes. DCD checks the exits for the new number of people.
Does a new gas line need DCD?
Yes, with works by a DCD-approved third-party contractor.
DCD rejected my extension. What now?
Who can help?
We prepare the fire and life safety drawings and handle DCD. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.