Do I Need a Completion Certificate After Extending My Restaurant?
Where the extension needed an authority permit for structural works, the permit is closed with an inspection and a completion certificate. Dubai Civil Defence (DCD) inspects the extended restaurant, and Dubai Municipality Food Safety can inspect before the new area is used.
The approvals are not finished when the works are. The authority, DCD and Food Safety inspections close the job, and the new area should not be used before them.
After the works
What closes a restaurant extension
| Who | What happens |
|---|---|
| Area authority (DM, DDA or Trakhees) | Inspection and completion certificate where a permit was issued |
| DCD | Fire and life safety inspection |
| DM Food Safety | Inspection of the new layout |
| Landlord, developer or mall | Their own completion check where they require it |
Official sites: Dubai Municipality | Dubai Civil Defence | DDA
What you need to know
- Close the permit: open permits cause problems later.
- Inspections before the new area opens.
- As-built changes must match the approved drawings.
- We follow the inspections for you.
Documents you will need
- Approved drawings and permit
- DCD approval
- Food Safety approval
- Contractor completion documents
How it works
How we handle it
1. Works done
As per approved drawings.
2. Our check
We compare the works with the drawings.
3. Authority inspection
Where a permit was issued.
4. DCD inspection
Fire and life safety.
5. Food Safety
Inspection of the layout.
6. Completion
Certificate and closure.
Questions
Questions owners ask
Do I need a completion certificate for a restaurant extension?
Yes, where an authority permit was issued for structural works. The permit is closed with an inspection and a completion certificate.
Does DCD inspect after the works?
Yes. DCD inspects before the new area is used.
Can I use the new area before the inspections?
No. Wait for the inspections.
Who can help?
We follow the inspections and the completion for you. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
