Can I Change My Boundary Wall or Gate in Dubai Hills?

Sometimes. Fences and gates stay no higher than the wall or 1.8 m, and rear and side changes are limited. It needs an Emaar NOC.

Changes are limited. Rear and side walls can change only where your yard is exposed by higher ground or faces a guard house, with Emaar approval and a neighbour NOC. Fences and gates stay no higher than the existing wall or 1.8 m, whichever is less. A front fence on top of the existing wall can go up to 1.4 m or the pillar height, whichever is greater. Gates open inwards, and no new gate can go in the rear wall. All subject to Emaar’s review.

HeightUp to 1.8 m
GatesOpen inwards
NeedsEmaar NOC

Emaar’s rules

Boundary wall, fence and gate rules

Emaar reviews every application, so these are subject to its review.

ItemWhat to expect
Rear and side wallsChanges only where the yard is visible from common areas because of higher ground, or the wall faces a guard house. Needs Emaar approval and a neighbour NOC.
HeightFence and gate no higher than the existing wall or 1.8 m, whichever is less.
Front fenceOn top of the existing wall, up to 1.4 m or the front pillar height, whichever is greater.
ColoursBlack, beige or dark brown, or dark timber. Simple designs only.
GatesOpen inwards and do not enter common areas. No new gate in the rear wall.
Privacy screeningPlants, or fencing with acrylic sheets. No other screening.
TownhousesRear changes only where higher common ground exposes the yard. Fences stay within the building line and no higher than the boundary wall.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Privacy: Plants, or fencing with acrylic sheets.
  • Colours: Black, beige, dark brown or dark timber.
  • Foundations: We check them before anything is added.
  • Neighbours: A neighbour NOC may be needed.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Dubai Hills

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

What is an Emaar NOC? →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.

Is Dubai Hills under DDA? →
📐

Structural Solutions

Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.

Dubai Hills approval guide →

Why applications come back

  • Design does not follow Emaar’s rules
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Questions

Questions owners ask

Can I raise my wall for privacy?

Only in limited cases, with Emaar approval and a neighbour NOC. Plants are the simple option.

Can I add a rear gate?

No, a new gate cannot go in the rear wall.

Which way can a gate open?

Inwards only.

What colours can I use?

Black, beige, dark brown or dark timber.